Laserfiche WebLink
South Bend Water Works <br />John Stancati, Director <br />9/4/01 <br />Exhibit A <br />PROJECT DESCRIPTION <br />Main Extensions as proposed in the Master Plan <br />- 24" main on Olive from Prairie to Ewing <br />- 24" main on Locust from-Ewing to Jackson <br />- 20" main on Jackson from Locust to Linden <br />- 20" main on Linden from Jackson to Johnson <br />- 20" main on Johnson from Linden to U.S. 31 <br />- 10" main on Keria from Chippewa to Ireland <br />Olive Street Building Renovations <br />- demolition of the coal silo <br />- demolition of the storage shed <br />- repair of the deteriorated floor <br />-remodel the exterior <br />Edison Plant <br />- stand-by power <br />- on-site chlorination generation <br />- update electrical at the wells <br />- addition for generator <br />Hickory and Carriage Hills Boosters <br />- to improve flow <br />Fellows Booster <br />- upgrade electrical <br />