Laserfiche WebLink
:I.HULL <br />TABLE 2 <br />MANAGEMENT STAFF <br />Principal................................ ............................... $180 <br />Senior Project Manager .... ............................... $150 <br />Project Manager ................. ............................... $125 <br />Government & Community Relations ............. $110 <br />ENGINEER <br />$100 <br />Senior Engineer ................... ............................... <br />$140 <br />Project Engineer .................. ............................... <br />$110 <br />Engineer2 ............................... ............................... <br />$95 <br />Engineer1 .................................. ............................$80 <br />Senior Designer ......................... ............................$90 <br />Designer................................... ............................... $75 <br />HYDROGEOLOGIST <br />Senior Hydrogeologist ....... ............................... $140 <br />Project Hydrogeologist ...... ............................... $110 <br />Hydrogeologist 2 ...................... ............................$90 <br />Hydrogeologist 1 ...................... ............................$75 <br />2014 BILLING RATE <br />SCHEDULE <br />SCIENTIST <br />Senior Scientist ................. ............................... $140 <br />Project Scientist ................ ............................... $110 <br />Scientist2 ............................. ............................... $90 <br />Scientist1 ............................. ............................... $75 <br />SUPPORT STAFF <br />Senior GIS Specialist ...... ............................... <br />$100 <br />GIS Specialist ..................... ............................... $75 <br />SeniorTechnician ................ ............................... $70 <br />Technician2 ......................... ............................... $60 <br />Technician1 ......................... ............................... $50 <br />Project Administrative Assistant ...................... $50 <br />NOTES: <br />1. Hourly billing rates for personnel apply to actual time spent in meetings concerning the project, <br />preparing for such meetings, project coordination time, design activities, field and office <br />investigations, and travel time when job - related. <br />2. If personal vehicles are utilized, travel mileage is billed at the federal mileage reimbursement <br />rate. If company -owned vehicles are utilized, rental rates of $100 /day, $350 /week, or <br />$1,000 /month are used in lieu of travel mileage. If rental vehicles are utilized, the actual cost of <br />the rental and gasoline will be billed directly with no mark -up. <br />3. Air transportation fees are billed directly with no mark -up. Travel time is typically billed only for <br />that time actually spent flying to /from the project location and does not include layovers, delays, <br />etc. <br />4. Project reimbursable expenses such as reproduction by vendors, overnight shipping, meals, and <br />lodging associated with travel or extended field activities, etc. are billed directly with no mark -up. <br />5. Field equipment rented from outside vendors is billed directly with no mark -up. Field equipment <br />owned by Hull, including individual equipment items or groupings of equipment such as sampling <br />kits, are billed at competitive market - equivalent rates for daily or weekly rental. <br />6. 6uE FRC WF\AkY I HHVDLH E pled to the Client at a rate equal to the subcontractor fee multiplied by <br />1.1 WLHFRYHUHu(WFRCWF\6DOWEL(Wrisk and associated operational expense. <br />HULL & ASSOCIATES, INC. JANUARY 2014 <br />INDIANAPOLIS, INDIANA SB1072.400.0002 <br />