My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amend Chapter 17, Add new Article 9 for Universal Water and Sewer Main Line Installation Construction Charges
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
2001
>
Amend Chapter 17, Add new Article 9 for Universal Water and Sewer Main Line Installation Construction Charges
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2008 9:49:12 AM
Creation date
8/28/2008 9:49:12 AM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Ordinances
City Counci - Date
11/26/2001
Ord-Res Number
9290-01
Bill Number
112-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 17-66 Water Main Lines Within City Limits -Assessment of Installation Charges <br />(a) City Residential Water Main Charges <br />All owners of single family residential property located within the corporate limits of the City <br />of South Bend shall be assessed a proportionate share of the cost of water main line installation <br />computed at $23.75 per lineal foot (LF) of that water main line which is installed along the boundary <br />of such parcel, at a total maximum rate of $2,000 per single family residential parcel. <br />(b) City Commercial/Industrial Water Main Charges <br />(1) All owners ofproperty used for commercial or industrial purposes located within <br />the corporate limits of the City of South Bend using 12" diameter main lines shall be assessed a <br />proportionate share of the cost of water main line installation computed at the rate of $30.53 per <br />lineal foot (LF) of that water main line which is installed along the boundary of such parcel, which <br />assessment is not subject to a maximum rate cap. <br />(2) All owners ofreal property located within the corporate limits ofthe City of South <br />Bend used for commercial or industrial purposes who require water main lines in excess of 12" <br />diameter shall be assessed a proportionate share of the cost of the water main line installation <br />computed at the actual cost, based on time and materials. <br />(3) All owners of property used for commercial or industrial purposes located within <br />the corporate limits of the City of South Bend using water main lines less than 12" diameter shall <br />be assessed the same rate as residential users, that is $23.75 per lineal foot (LF) without the <br />maximum rate cap. <br />Section 17-67 Water Main Line Outside City Limits -Assessment of Installation Charges <br />(a) Non-City Residential Water Main Charges <br />All owners of single family residential property located outside the corporate limits of the <br />City of South Bend shall be assessed a proportionate share of the cost of water main line installation <br />computed at $28.50 per lineal foot (LF) of that water main line which is installed along the boundary <br />of such parcel, which assessment is not subject to a maximum rate cap. <br />(b) Non-City Commercial/Industrial Water Main Charges <br />(1) All owners ofproperty used for commercial or industrial purposes located outside <br />the corporate limits of the City of South Bend using 12" diameter main lines shall be assessed a <br />proportionate share of the cost of water main line installation computed at the rate of $36.64 per <br />lineal foot (LF) of that water main line which is installed along the boundary of such parcel, which <br />assessment is not subject to a maximum rate cap. <br />(2) All owners ofreal property located outside the corporate limits of the City of <br />South Bend used for commercial or industrial purposes who require water main lines in excess of <br />12" diameter shall be assessed a proportionate share of the cost of the water main line installation <br />computed at the actual cost, based on time and materials, plus an additiona110% for costs to the City <br />
The URL can be used to link to this page
Your browser does not support the video tag.