Laserfiche WebLink
• Coordinate with the <br />• July 2014 <br />• NNN <br />• Hazards and blocks for replacemer <br />City Engineering <br />Infrastructure <br />are identified on the working map <br />Department on policies <br />Committee <br />. Hazards are marked in compliance <br />and procedures. <br />with the Engineering Department <br />• Identify and mark <br />policies <br />sidewalk and curb <br />hazards. <br />• Identify blocks for <br />sidewalk and curb <br />replacement. <br />Host information sessions <br />. July 2014 <br />• NNN <br />• At least one information session <br />about the hazards in the <br />Infrastructure <br />held <br />neighborhood, property <br />Committee <br />• At least 25 participants <br />owner responsibility for <br />sidewalks, and the City's <br />financial assistance program <br />for curbs and sidewalks. <br />Partner with the <br />• Within two to <br />• South Bend <br />• 100% walkable sidewalks <br />Engineering Department on <br />three years, high <br />Engineering <br />their 50150 sidewalk repair <br />volume foot <br />Department <br />program. <br />traffic sidewalks <br />• Property Owners <br />and key <br />• NNN <br />intersections are <br />Infrastructure <br />repaired. <br />Committee <br />• Within five to six <br />years, the <br />remaining <br />neighborhood <br />sidewalks are <br />repaired. <br />