Laserfiche WebLink
Identify key connector <br />• March 2014 <br />• NNN <br />• Pedestrian crossing locations added <br />routes, potential special <br />Infrastructure <br />to working map <br />treatment crosswalk <br />Committee <br />locations, and locations for <br />• Department of <br />demand - responsive <br />Public Works <br />pedestrian signals. <br />Solicit local artists to <br />• December 2014 <br />• NNN <br />• Neighborhood vote is conducted to <br />design custom crosswalk <br />Infrastructure <br />select the preferred crosswalk <br />treatments to represent <br />Committee <br />treatment design <br />fun, family, and safety. <br />• Department of <br />Public Works <br />Propose crosswalk and <br />• July 2016 <br />• NNN <br />• Proposal is presented to DPW with <br />pedestrian demand- <br />Infrastructure <br />cost estimates and funding proposal <br />responsive signals to the <br />Committee <br />Department of Public <br />• Department of <br />Works. <br />Public Works <br />Installation of crosswalks <br />• July 2018 <br />• Department of <br />• Installation is complete <br />and demand - responsive <br />Public Works <br />