Laserfiche WebLink
Infrastructure & Connectivity <br />A Rails to Trails Bike Path is proposed to connect the Riverside Trail to the MILK Community Center. <br />North Riverside Walking Path would provide a pedestrian route along Riverside Avenue to the Riverside Trail. Currently in the City's <br />bike plan the route is a shared route with vehicles along Riverside and Lafayette. <br />South Bend 50/50 Sidewalk Repair Program allows for partnership between the South Bend Department of Engineering and property <br />owners for replacement of sidewalks. While there is a waiting list for the program currently, the program is one mechanism for <br />sidewalks to be repaired /replaced in the neighborhood. <br />pedestrian traffic routes, <br />key connector routes, and <br />key points of interest. <br />Host a presentation to • July 2014 <br />inform neighbors of the <br />current walking/bicycling <br />routes within the <br />neighborhood that offer <br />ways to connect with the <br />city. Promote new possible <br />routes to improve <br />accessibility to key areas of <br />South Bend. <br />Host informational • October 2014 <br />meetings about bike lanes <br />with neighbors and <br />property owners about <br />how to bike safely in the <br />lanes and how to drive <br />safely when cyclists are <br />using bike lanes. <br />• NNN <br />• Develop a "working" map (living <br />Infrastructure <br />document) in digital and physical <br />Committee <br />formats highlighting pedestrian <br />traffic, bicycle traffic, connector <br />routes, and points of interest <br />• NNN <br />• Meeting has participation from the <br />Infrastructure <br />city <br />Committee <br />• At least 20 people attend the <br />meeting <br />• Map is available in NNN office and <br />online <br />• NNN • At least one information meeting is <br />Infrastructure held with at least 25 participants <br />Committee • Support is demonstrated for bike <br />lanes <br />52 <br />