My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appropriating $583,510.00 Cumulative Sewer Building and Sinking Fund
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
1970
>
Appropriating $583,510.00 Cumulative Sewer Building and Sinking Fund
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2014 11:42:29 AM
Creation date
1/2/2014 9:27:28 AM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Ordinances
City Counci - Date
2/24/1970
Ord-Res Number
5154-70
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
January 14, 1969 <br />CITY OF 80UTH BEND, INDIANA -- ENOINURINO DWPARTMENT <br />Project 01 (1970) Washington & 36th Street <br />Storm Water Detention Basin (Lagoon K) <br />estimated Cost <br />60,000 c.y. excavation A $2.00 $120,000.00 <br />Sodding and seeding slopes 6,000.00 <br />Land acquisition (36 lots) 24,Q00.00 <br />Land acquisition costs 2,400.00 <br />Engineering (6% x $126,000) 7,560.00 <br />Total Estimates Project Goat - - - - $159,960.00 <br />Project #11 (1970) Ponsha & 33rd Street <br />Storm Water Detention Basin (Lagoon A) <br />Lagoon Construction Cost including inlet <br />and outlet pipe 96,040.00 <br />Land Acquisition (15 losts 0 $700 ea.) 10,500.00 <br />Land Acquisition Costs 1,050.00 <br />Wq ineering (6% x $96,040) 5,760.00 <br />$113,350.00 <br />Project VIII (1970) Sampson & Randolph Street <br />Storm Detention Basin (103) <br />Lagoon Construction Cost 69,000.00 <br />Sewers in Detention Basin 113 Area 90,000.00 <br />Land Acquisition 110,000.00 <br />Land Acquision Costs 11,000.00 <br />Engineering 14,000.00 <br />$294,x00.00 <br />Project IV (1970) Chippewa -Main Street <br />Storm Water Improvements <br />Construction Cost, 15,000.00 <br />Engineering 1,200.00 <br />$16,200.00 <br />✓.�,�V�✓ <br />c <br />$583,510.00 <br />J - y <br />
The URL can be used to link to this page
Your browser does not support the video tag.