Laserfiche WebLink
9K temporary <br />walkway <br />Such sidewalk, cover may be one -half of the width of the sidewal <br />but shall not be less than Q feet wide. The roof of same shall be of <br />solid plank or plywood not less than 2 inches nominal thickness with an <br />outer edge splash -rail not less than 48 inches high and an enclosed back, <br />all rigidly supported and of sufficient strength to resist the force of <br />and falling materials. The headroom under such protecting cover shall not <br />approaches be less than 8 feet above the sidewalk. All changes in elevation shall <br />be provided with suitable steps or an easy graded approach at each end <br />with proper handrails. The ^ralkeray4, must be kept open and unobstructed <br />by material, rubbish or snow at all times and it shall be kept properly <br />lighted during the hours of darkness. <br />walk When it becomes necessary to reconstruct the permanent sidewalk <br />or build a vault under the sidewalk, a suitably surfaced we}t not less <br />than fee vn e s a e ui in he s reet on a level wish and connected <br />to the adjoining sidewalks and so constructed as not to obstruct the flow <br />of grater in the gutter. <br />temporary <br />walkways Such -s shall not be maintained outside of the curb line <br />more than 48 hours after the retaining walls around such vaults have been <br />built to grade and the sidewalk work and all other construction work is <br />completed. <br />SECTION 3. TEjff'ORARY SEEDS: Temporary sheds or trailers for <br />office purposes or for storage of tools and materials may be erected or <br />parked upon the public property within the limits prescribed for materials. <br />SECTION G. PERAIT DURING OPERATION ONLY: The permission to <br />temporarily occupy streets and sidewalks for the purpose of building is <br />intended for use only in connection with the actual erection, repairing, <br />alteration or removal of buildings and is terminated after completion of <br />such operations, and it shall be unlawful to occupy any street or side - <br />walk after the completion of the operation for which the permit has been <br />issued. <br />If at any time building operations shall be discontinued for <br />a period of more than 30 days all such temporary buildings and obstruct- <br />ions must be removed, leaving a clear unobstructed roadway. <br />Such period of 30 days may be extended at the discretion of <br />the City Engineer to alloy for acts of God, strikes, and other acts be- <br />yond the contractor's control. <br />SECTION 5. TEMPORARY FENCES: Temporary wooden fences to shield <br />lots during building operations may be erected upon public property if the <br />permit for the same has been obtained. Such fences are not to be less <br />than Q feet nor more than 8 feet in height, and such fences shall be re- <br />moved within 10 days after the external walls of the building are erected <br />and the roof enclosure covered in. <br />SECTION 6. ADVERTISING: It shall be unlawful to use the vialls <br />or any portion of the temporary sheds or sidewalk coverings or any fences <br />built around building operations for billboards or for any manner of ad- <br />vertising, except such as may pertain to the building itself. <br />SECTION 7. REVOCATION OF PERP:ZT: Any permit for the occupancy <br />of public property may be revoked bur the Citv Engineer at his discretion. <br />- 2 - <br />