Laserfiche WebLink
REGULAR MEETING DECEBER 10- <br />M 2013 367 <br />TOTAL AMOUNT BASE BID ITEMS 1 THRU 6 $464.861.00 <br />Item <br />No. <br />ADD Alternate 91 - Removal, <br />Unit <br />Add per <br />Deduct per Unit <br />2013 or Newer 66,000 lb. G V R <br />International <br />Management, (including all air <br />Unit Price <br />Price <br />A <br />Removal, Management, and Disposal <br />Linear <br />monitoring during tunnel abatement <br />_ - <br />_ <br />ofTSI Pipe Wrap <br />Feet <br />7 <br />and clearance), and Disposal of <br />l <br />Lump <br />Square <br />_ <br />Regulated Asbestos - containing <br />ofTSl Tank Wrap <br />Sam <br />$55.00 <br />$48.00 <br />Materials from tunnels below and <br />C <br />of Asbestos- containing Floor Tile and Square <br />adjacent to all buildings_ <br />_ <br />Mastic I Feet <br />_ <br />$51,31.3_.00 <br />$51,313.00 <br />Retnoval, Management, and Disposal <br />REPLACEMENT Alternate 44A - <br />of Ashestos- Containing Material <br />Square <br />Removal, Management, and <br />�D <br />__ (Transite). <br />Feet <br />4A <br />Disposal of Asbestos- Containing <br />1 <br />Lump <br />Material (Transite) with Exterior <br />Sum <br />_ <br />Metal or Wood Substrate or Sidin . <br />_ <br />$178,423.00 ..$178,423.110 <br />Item <br />No. <br />Unit Pricing if Required <br />Unit <br />Add per <br />Deduct per Unit <br />2013 or Newer 66,000 lb. G V R <br />International <br />S 143,354.18 <br />Unit Price <br />Price <br />A <br />Removal, Management, and Disposal <br />Linear <br />_ - <br />_ <br />ofTSI Pipe Wrap <br />Feet <br />$18.00 <br />$15.00 <br />B <br />Removal, Management, and Disposal <br />Square <br />_ <br />_ <br />ofTSl Tank Wrap <br />Feet <br />$55.00 <br />$48.00 <br />Removal, Management, and Disposal <br />C <br />of Asbestos- containing Floor Tile and Square <br />_ <br />Mastic I Feet <br />_ <br />$4.50 <br />$3.50 <br />Retnoval, Management, and Disposal <br />of Ashestos- Containing Material <br />Square <br />�D <br />__ (Transite). <br />Feet <br />$8.00 <br />$6.00 j <br />Upon a motion by Mr. Gilot, seconded by Ms. Roos and carried, the above bids were referred to <br />Community Investment and Engineering for review and recommendation. <br />BOARD MEMBER JOINS MEETING IN PROGRESS <br />Board Member Mark W. Neal joined the Board Meeting in progress at 9:41 a.m. <br />OPENING OF BIDS - ONE (1) OR MORE, 2013 OR NEWER 66,000 LB. GV WK TRf -AXLE <br />ROLL -OFF CHASSIS (W'ASTEW'ATER CAPITAL)-- <br />This was the (late set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which wen; found to be sufficient. The following bids were opened and publicly <br />read: <br />SELKING INTERNATIONAL <br />4849 W. Western Avenue <br />South Bend, Indiana 46619 <br />Bid was signed by: Mr. Kermeth Waite <br />Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non - Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. Indiana Local Business Preference Claim form was <br />submitted <br />'fen (10 %) Bid Bond was submitted <br />19 <br />Estimated <br />Q <br />Item <br />Manufacturer <br />Unit Price <br />2013 or Newer 66,000 lb. G V R <br />International <br />S 143,354.18 <br />