My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Annexing Areas in Clay & German Township
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
1973
>
Annexing Areas in Clay & German Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 1:52:10 PM
Creation date
12/2/2013 1:42:27 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Ordinances
City Counci - Date
6/27/1973
Ord-Res Number
5539-73
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />page 4. <br />4. Street Lighting <br />The annual cost of street lighting is approximately $1,200 per <br />mile. On the basis of 72 miles of streets, the cost will be <br />$86,400. <br />5. Sanitary Sewer Service <br />Trunk sewers would be provided for the a <br />of $950,000, worth of 12, 15 and 18 inch <br />pumping stations. The replacement costs <br />and pumping station in the proposed area <br />Inc. are estimated to be worth $120,000. <br />trunk sewer system would be $1,070,000. <br />rea by the construction <br />diameter pipes plus 2 sewage <br />of the existing sewers <br />owned by Clay Utilities, <br />The total cost for the <br />Based on 50 miles of local sewers, the cost of construction is estimated to <br />be $2,112,000. If the City participates in 50% of this cost, this would re- <br />sult in a cost of $1,056,000. <br />Financing of this construction could be accomplished in several ways. First, <br />Federal Water and Sewer Grants are expected in the near future for this type <br />of construction. Based on 75% Federal participation, 10% State participation, and <br />the remainder from local sources, the local cost would be $318,900. In the event <br />this type of financing was unavailable, general obligation (G.0) bonds could be <br />issued for the construction of trunk sewers in the amount of $1,070,000. Based <br />on 5% Interest and 25 year term, the annual cost would be $75,919. The City has <br />the bonding capacity to float this amount of loans. <br />6. Trash and Garbage Collection <br />This service is provided for a fee of $3.00 per month per family <br />and is currently a self- supporting service: No City costs are <br />assigned to this service. The service is available on demand from <br />City residents. <br />7. Water Service <br />The construction of feeder mains including toll road crossings, <br />U.S. 31 crossings and an additional well field plus the replace- <br />ment costs of the Clay Utilities, Inc. installation is estimated <br />to be $819,000. This cost would be covered by a Water Works Revenue <br />Bond issue. The bonds would be repaid by revenues and therefore no <br />cost is assigned to the City. <br />8. Parks <br />The City proposes to assume the maintenance of Clay Park at any esti- <br />mated annual cost of $15,000. It is further proposed to light the <br />baseball diamond at a cost of $65,000. and add additional bleachers <br />at a cost of $10,000. Additional playground equipment for the Clay <br />Park and the school sites would cost about $7.,000. The annual cost <br />would be $42,333. <br />
The URL can be used to link to this page
Your browser does not support the video tag.