My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/12/13 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2013
>
11/12/13 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:03:24 PM
Creation date
11/27/2013 8:56:06 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
11/12/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING NOVEMBER 12, 2013 335 <br />Upon a motion made by Mr. Mecham, seconded by Mr. Relos and carried, the above bids were <br />referred to the Street Department for review and recommendation. <br />OPENING OF PROPOSAL — BOLAND DRIVE MULTI -USE PATH — PROJECT NO. 113- <br />047 <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Proposals for <br />the above referenced Professional Services proposal. The following Proposals were received and <br />opened: <br />THE TROYER GROUP <br />550 Union Street <br />Mishawaka, Indiana 46601 <br />LAWSON-FISHER ASSOCIATES P.C. <br />525 West Washington Avenue <br />South Bend, Indiana 46601 <br />DLZ <br />2211 East Jefferson Boulevard <br />South Bend, Indiana 46615 <br />AMERICAN STRUCTUREPOINT INC <br />7260 Shadeland Station <br />Indianapolis, Indiana 46256-3957 <br />DONOHUE/HERCEG <br />211 West Washington Street, Suite 2100 <br />South Bend, Indiana 46601 <br />CHA <br />1251 North Eddy Street, Suite 201 <br />South Bend, Indiana 46617 <br />Mr. Gilot noted that professional engineering services need not be bid. Upon a motion made by <br />Ms. Roos, seconded by Mr. Relos and carried, the above Proposals were referred to Engineering <br />for review and recommendation. <br />TABLED - OPENING OF QUOTATIONS — WATER WORKS NORTH STATION WELL <br />RECONDITION OR REPLACEMENT —PROJECT NO 113 046 <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. John Wiltrout, Water Works requested that this be tabled due to <br />ambiguity with the specifications. This request went out prior to the meeting, so no bids were <br />received or opened. Upon a motion made by Ms. Roos, seconded by Mr. Mecham and carried, <br />the opening of the above Quotations was tabled. <br />OPENING OF QUOTATIONS — IGNITION PARK SOUTH DEMOLITIONS PHASE 4 — <br />PROJECT NO. 113-044 <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. The following Quotations were opened and read: <br />B&J EXCAVATION INC <br />1104 West Donald Street <br />South Bend, Indiana 46613 <br />Quotation was submitted by Mr. Darnell O'Neal <br />QUOTATION: <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Demolish 913-915 West Indiana <br />Avenue <br />1 <br />Lump Sum <br />$10,000.00 <br />$10,000.00 <br />2 <br />Demolish 725-747 West Indiana <br />Avenue <br />I <br />Lump Sum <br />$li,000.00 <br />$13,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.