Laserfiche WebLink
Exhibit E <br /> SEWER INSURANCE <br /> CONTRACTOR RATE SCHEDULE <br /> Effective through December 31, 2014 <br /> Pre-qualification category: Second opinion <br /> Cable Angering $200.00 Hour <br /> Pre-qualification category: Excavation <br /> Notes: <br /> 1. Total crew size shall be a maximum of two persons unless otherwise approved by the Sewer <br /> Insurance Administrator or representative thereof. <br /> 2. Equipment costs shall include operator for same <br /> 3. Contractor shall invoice all other material used on an itemized basis. <br /> Trip Charge for Excavator $250.00 Job <br /> Excavator $140.00 Hour <br /> Trip Charge for Other Equipment $70.00 Job <br /> Rubber tire backhoe $80.00 Hour <br /> Mini excavator $80.00 Hour <br /> Compactor(hand) $50.00 Job <br /> Dump truck (20 yd) $80.00 Hour <br /> Dump truck/trailer $65.00 Hour <br /> Laborer $55.00 Hour <br /> Saw Cutting $75.00 Job <br /> Trench box, 6' x 6' $140.00 Job <br /> Trench box, 8' x 10' $300.00 Job <br /> Trench box, 8' x 16' $400.00 Job <br /> Topsoil (2" depth) $75.00 Job <br /> Pre-qualification category: Special <br /> Special conditions shall be address by the Sewer Insurance Administrator through City of South Bend <br /> emergency contracting procedures. <br /> 14 <br />