Laserfiche WebLink
III. Pier Park: <br />Contract No. 1. - Base contract <br />Upper Plaza Area w /benches & concrete paving <br />Foot Bridge to Powerhouse <br />Timber Steps & Walk <br />Boardwalk (South of Colfax Bridge) w /piling (all) <br />Cabion Revetment (Errosion Protection) <br />Floating Docks <br />Pier Park Sign <br />Concrete Seal Wall (West Race Wall) <br />Topsoil $112,961.00 <br />Contract No. 2. - Landscaping <br />Seeding & planting 13,790.00 <br />Contract No. 3. - Electrical <br />Lighting & wiring 9,348.00 <br />Alternate - Pedestrian ramp to Colfax 11,901.00 <br />Additional Engineering Fees for Contract <br />Reorganization 2,000.00 <br />$150,000.00 <br />The Park Department has preliminary plans of each project and would be happy <br />to review the plans with the Council. <br />