My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appropriating $85,000 Cumulative Sewer Building and Sinking
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
1975
>
Appropriating $85,000 Cumulative Sewer Building and Sinking
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2013 1:46:36 PM
Creation date
11/7/2013 8:28:01 AM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Ordinances
City Counci - Date
7/14/1975
Ord-Res Number
5852-75
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND <br />South Bend, Indiana 46601 <br />Jerry J. Miller <br />Mayor <br />Rollin E. Farrand, Sr., P. E. <br />Director, Public Works <br />Members of the Common Council <br />441 County -City Building <br />South Bend, Indiana 46601 <br />Subject: Model Cities Sewer Separation <br />Engineering Contract <br />Dear Sirs: <br />Reply To: Department <br />of Public Works <br />June 11, 1975 <br />The contract for this design project was signed by the Board of Public <br />Works on October 27, 1972. This contract called for a fee based on a <br />percentage of the construction cost, the fee to be determined by a fee <br />curve which was made part of the contract. <br />The total estimated construction cost of this project is $2,438,913.30. <br />You may recall that a Federal grant of approximately $540,000 has been <br />made available for this construction. <br />Based upon the above referenced construction cost and a fee of 6.08 %, a <br />total engineering fee for this design work is estimated to be approximately <br />$148,285.93. <br />The original appropriation for this design contract was in the amount of <br />$66,000. We are now asking that the remaining portion of this fee, $85,000, <br />be appropriated so that the consultant can be paid. <br />Right -of -way is currently being purchased out of a previous appropriation <br />of approximately $100,000. It is anticipated that plans will be complete <br />and the project ready for construction advertising by the time the right - <br />of -way purchasing is completed. <br />Very truly yours, <br />Rollin E. Farrand, P. E. <br />Director <br />REF:der <br />
The URL can be used to link to this page
Your browser does not support the video tag.