My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amending Chapter 6 Generally known as the Building Ordinance
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
1977
>
Amending Chapter 6 Generally known as the Building Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2013 3:22:27 PM
Creation date
10/9/2013 3:00:49 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Ordinances
City Counci - Date
6/13/1977
Ord-Res Number
6162-77
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sec. 304 Fees. Application for a permit for installation of <br />heating, ventfl—ating, air conditioning and re rigera ion equipmen <br />shall be accompanied by fees in accordance with the following sc edu e: <br />"SPACE HEATERS AND PORTABLE HEATERS (EACH) <br />"30,000 B.T.U. input or more ......................$ 3.00 <br />"60,000 to 300,000 <br />B.T.U. input <br />- lst <br />unit <br />.. .. .... 5.00 <br />2nd <br />unit <br />"300,000 B.T.U. <br />input or more <br />.3.00 <br />10 00 <br />"BOILERS (STEAM OR <br />HOT WATER) <br />"60,000 to 300,000 <br />B.T.U. input <br />- lst <br />unit <br />....... 5.00 <br />2nd <br />unit <br />"300,000 B.T.U. <br />input or more <br />.3.00 <br />10.00 <br />"OIL AND GAS CONVERSIONS <br />1160,000 to 300,000 <br />B.T.U. input <br />- lst <br />unit <br />............5.00 <br />2nd <br />unit <br />11300,000 B.T.U. <br />input or more <br />.3.00 <br />.10.00 <br />"ELECTRIC FURNACES <br />(AIR HANDLING) <br />"Less than 100 <br />K.W. input - lst <br />unit <br />5.00 <br />2nd <br />unit <br />.3.00 <br />"100 K.W. input <br />or more .... ...... ...................10.00 <br />"AIR CONDITIONING <br />w <br />"Less than 7 1/2 tons .10.00 <br />"7,1/2 tons or more ......... .........................15.00 <br />INDOW UNITS ELECTRI <br />- lst unit ......... <br />...........no fee <br />3.00 <br />............1.00 <br />"REFRIGERATION AND ENGINE - DRIVEN GAS -FIRED OR OIL -FIRED <br />COOLING EQUIPMENT <br />_ 1 to 7 1/2 horsepower or less than 90,000 B.T.U. <br />C92 .10.00 <br />More than 7 1 2 horsepower or 90,000 B.T.U. cooling <br />or more .15.00 <br />"INCINERATORS <br />'5 cubic Feet or less .3.00 <br />"More than 5 cubic feet ............................... 3.00 <br />.............................. <br />plus $1.00 for each cubic foot in excess of 5 cubic feet <br />aximum fee .50.00 <br />"When the total capacit of an system in an single installation <br />is provided by more than one 1 unit, the summation of the capacities <br />of each unit and the total number of such units shall determine the <br />fees as provided in the schedule above." <br />22 -. <br />
The URL can be used to link to this page
Your browser does not support the video tag.