Laserfiche WebLink
an inspection <br />Subsection (d). <br />1. FOUNDATION INSPECTION: To be made after trenches are <br />Fl <br />"transit mixed ") <br />on the Job . <br />2. FRAME INSPECTION: <br />e. <br />and <br />3. LATH AND /OR WALLBOARD INSPECTION: To be made after all <br />lathing and /or wallboard interior and exterior, is in <br />place, but before any plastering is applied or before <br />wallboard joints and fasteners are taped and finisled. <br />4. FINAL INSPECTION: To be made after building is complet- <br />ed and ready for occupancy. <br />(v) Other Inspections. In addition to the called inspec- <br />tions specified above the Building 0 facia may ma e <br />or require any other inspections of any construct on <br />work to ascertain compliance with the provisions of <br />this Code and other laws which are enforced by the <br />(vi) <br />the e. the ur t2g of determining compliance with <br />O1 ( Building Official may cause an <br />to be reinspected . <br />such inspection or reinspection. <br />- 10 - <br />