Laserfiche WebLink
110 01 Supervision <br />The three men that constitute the members of this group provide <br />the supervision of the Wastewater Plant. <br />110 05 Office & Clerical <br />At the present time the Clerical work at the Plant is done by <br />three clerks. <br />110 16 Laboratory <br />Each year as Wastewater Treatment Technology becomes more <br />sophisticated, this group of young people becomes more and more <br />important. <br />120 01 Plant Operators <br />The Wastewater Plant, operates 24 hrs. a day 365 days per year. <br />At any given time there are six operators on duty. <br />120 09 Maintenance Personnel <br />The recent plant expansion, has greatly increased the amount <br />of equipment that we have to maintain. Additionally that equipment <br />which constituted the equipment of the original plant is now twenty <br />years old and needs increasingly more attention. The increasing <br />attention being directed to the Pollution control field makes it <br />important that we have a reliable plant. <br />120 20 Lift Station - Diversion Chamber Operators <br />There are two crews and two trucks that make daily checks of the <br />42 Diversion Chambers - 8 river crossing and 11 Lift Stations. <br />Without a question it is in this area that we can expect an early major <br />thrust from the E. P. A. working through the State Board of Health. <br />