My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6E2
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2013
>
10-10-13
>
6E2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2014 12:15:56 PM
Creation date
10/7/2013 5:05:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Dave Relos <br />October 3, 2013 <br />Page 5 of 7 <br />has been defined Weaver Boos will prepare a Corrective Action Plan (CAP) or Remediation <br />Work Plan (RWP). A specific scope of work and cost estimate for the preparation and <br />implementation of the CAP cannot be provided until the site characterization has been <br />completed. The CAP will be prepared in accordance with IDEM rules. The CAP will be <br />prepared separately from the ISC/FSI Reports and may or may not be submitted to IDEM <br />concurrently depending upon the magnitude of the subsurface impacts. <br />Task 4 — Implement Corrective Action Plan/Remediation Work Plan (f necessary) <br />Weaver Boos can implement corrective action if found necessary by the City based on site <br />conditions. <br />Task 5 — Request Closure/NFA (f necessary) <br />Once IDEM approves the CAP (review will normally occur within 60 days of submittal), Weaver <br />Boos will implement the CAP. Periodic progress reports may be required to be prepared and <br />submitted to IDEM. Once the CAP has been completed then a closure report will be submitted <br />requesting a No Further Action Letter (NFA) letter for the release. If no groundwater impacts are <br />identified during site characterization, Weaver Boos anticipates that additional soil excavation <br />and disposal will be considered as the preferred corrective action to be implemented in response <br />to this incident should additional impacted soil be identified. <br />If results of the ISC completed as part of Task 1 indicate that the soil and groundwater <br />contaminant concentration do not exceed RCG screening levels then no further action will be <br />warranted and the overall project will be deemed complete. Tasks 2 -5 will not be necessary. <br />SCHEDULE <br />Task 1 can be completed within 60 days of authorization. An estimate schedule to complete the <br />remainder of the tasks outlined (if deemed necessary) is entirely dependent upon the extent of <br />subsurface impacts identified. <br />COST ESTIMATE <br />Weaver Boos proposes to perform the work as outlined in Task 1 on a time and material basis in <br />accordance with our fee schedule included with this proposal. We estimate the work can be <br />completed for the budget summarized below. The budget does include three permanent <br />
The URL can be used to link to this page
Your browser does not support the video tag.