Laserfiche WebLink
Sec 21 -1 (a.) Flood protection grade - the lowest elevation around the <br />(22.,4) perimeter o a u 1-d g a,t w is . oo a he <br />interior of the building. <br />21 -1 (a) Floodproofed building - a commercial or industrial building <br />(22.5) designed to maintain a dry interior. A11 such, flo'odproofi:n <br />shall be adequate to withstand the flood depths', pressures, <br />velocities, impact and uplift force's and other factors <br />associated with a recqulatory flood. <br />21 -1 (a) Floodproofing - a combination of structural and non- structural <br />(22.6) additions, changes, or adjustments to properties and structures <br />which maintain a dry interior and eliminate flood damage to <br />lands, water and sanitary facilities, and contents of buildings. <br />21 -1 (a) Floodway - the channel of a river or stream and those portions <br />(22.7) of the flood plain which are reasonably required to efficientl <br />carry or discharge the flood water of the river or stream, <br />so designated in—the Flood Insurance Study of the City of <br />South Bend ", Indiana prepared by Johnson & Anderson for the <br />Federal Insurance Administration. <br />21 -1 (a) Floodway Fringe - that portion of a flood hazard area outside <br />(22.8) the limits of the floodway, so designated in the Flood <br />Insurance Study of the City of South Bend,- Indiana, prepared <br />by Johnson & Anderson for the Federal Insurance Administration. <br />21 -1 (a) Improvement Location Permit - a permit issued by the <br />(30.1) Building Commissioner in accordance with the provisions of this <br />Ordinance prior to the erection or alteration and use of a <br />building or structure or use of land, stating that the proposed <br />building, structure, and /or uses comply with all applicable <br />provisions of this Ordinance, <br />21 -1 (a) Natural Resources Commission - the Natural Resources Commission <br />(42.2) of the State of Indiana. <br />21 -1 (a) Regulatory flood profile - a long <br />(47.1) thread of a river or stream showi <br />attained by the requlatory flood. <br />itudinal profile along the <br />ng the maximum water surface <br />21 -1 (a) Substantial improvement - for purposes of flood plain regulation, <br />(49.1) any repair, reconstruction, or improvement of a structure, <br />the cost of which equals or exceeds fifty per cent 500 <br />of the market value of the structure, excluding the value <br />of the land, either (a) before the improvement is commenced, <br />or (b) prior to damage if the structure has been damaged and <br />is being restored. Substantial improvement shall be considered <br />to occur when the first alteration of any wall, ceiling, or <br />other structural part of the building commences. The term <br />shall not include any repair, reconstruction, or improvement <br />of structures listed on the National Register of Historic <br />Places or the State Inventory of Historic Places, or structures <br />designated as historic landmarks by the local legislative <br />body. <br />)SECTION II. <br />Chapter 21, Article I, of Section 21 -4 of the Municipal Code <br />of South Bend, Indiana, be amended by adding the following: <br />Sec. 21 -4.1 Within a designated flood plain, floodway, or floodway <br />fringe, the provisions of this Ordinance relative to land <br />use and control and other measures designed to minimize <br />or eliminate existing or potential flood hazards shall take <br />precedence over any conflicting provisions of the Zoning <br />nrH i nAnr -A <br />- 2 - <br />