My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C1
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2013
>
09-12-13
>
6C1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2014 12:11:51 PM
Creation date
9/9/2013 12:12:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Christopher B. Burke Engineering, LLC <br />13 220 W. Colfax Ave. Sul(e 500 South Bend, IN 46601 574.282.8001 chhel- in.com <br />September 6, 2013 <br />David Relos <br />City of South Bend, Department of Community Investment <br />14th Floor County -City Building <br />South Bend, IN 46601 <br />Subject: Crooked Ewe Sidewalk Project (113 -041) <br />Professional Services Proposal <br />Dear Mr. Relos: <br />Christopher B. Burke Engineering, LLC ( CBBEL) is pleased to provide this proposal for professional <br />engineering services related to the Crooked Ewe Sidewalk Project in the City of South Bend. The <br />following is our understanding of the assignment, scope of services, and estimated fee in support <br />of the project. <br />UNDERSTANDING OF THE ASSIGNMENT <br />CBBEL understands the City is seeking design assistance in the development of quote documents <br />for the construction of curb, drive approaches, and sidewalk along the frontage of the future <br />Crooked Ewe Brewery and Ale House. <br />Services to be provided by CBBEL for this work have been identified as follows: <br />Task 1 - Survey <br />A topographic survey to supplement existing data for the project area will be performed by a <br />subconsultant (JPR). A utility locate with relevant utilities will be conducted so the utilities are <br />included in the survey. Upon final design, legal descriptions and parcel plats will be prepared by <br />JPR for the new right of way and an ingress and egress easement to access the City's River <br />Crossing #2. The proposal from JPR is attached to this proposal as an exhibit. <br />Task 2 - Design / Quote Assistance <br />CBBEL staff will design and prepare final quote documents for the project. Plans and <br />specifications will be prepared in accordance with City Standards and Specifications. <br />Specifications will be developed utilizing standard specifications provided by the City in addition <br />to CBBEL standard specifications. Applicable conflicts will be brought to City attention. <br />INDOT Permitting is anticipated and will be coordinated through the City's Division of <br />Engineering. <br />Crooked Fwe Sidewalk Proles t Sepfeinbrr 6. 101 3 <br />19 . RI 30440.00000 Page I <br />
The URL can be used to link to this page
Your browser does not support the video tag.