My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/25/04 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2004
>
10/25/04 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2013 1:52:53 PM
Creation date
8/30/2013 1:48:11 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/25/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING OCTOBER 25, 2004 <br /> Alternate 4 Concrete Dining Patio $3,350.00 <br /> Alternate 4A Landscaping at Concrete $1,100.00 <br /> Dining Patio <br /> Alternate 5 Asphalt Service Drive $13,600.00 <br /> Alternate 6 Additional Parking Area and $8,750.00 <br /> Concrete <br /> Alternate 7 Landscaping for Additional $2,220.00 <br /> Parking Area <br /> Alternate 8 Landscaping at Building $3,300.00 <br /> Perimeter and Yards <br /> Alternate 9 Complete Irrigation System $10,000.00 <br /> with Full Coverage of Entire <br /> Landscaping and Grass <br /> Alternate 10 5'-0" High PVC Privacy $1,200.00 <br /> Fence and Concrete Mow <br /> Strip <br /> Alternate I 1 Replace Existing Fencing $15,700.00 <br /> from Southwest Corner of <br /> Property to Southwest Corner <br /> of South Well Field Property <br /> Alternate 12 Downspouts to Grade with -$1,200.00 <br /> Splash Blocks in Lieu of <br /> Underground Connection to <br /> Storm Drainage System <br /> Alternate I') Flagpole and Base $1,750.00 <br /> Alternate 14 Floor Sealer $4,400.00 <br /> Alternate 15 Provide Pella Designer Series $3,600.00 <br /> Windows Hartford Green <br /> Exterior with Prefinished <br /> White Interior and Blinds in <br /> Between the Glass In Lieu of <br /> Anderson 400 Series <br /> Windows <br /> Alternate 16 One (1) Layer of Type "X" -$1,500.00 <br /> Gypsum Board at Exterior <br /> Walls In Lieu of Two (2) <br /> Layers <br /> Alternate 17 Horizontal Mini Blinds at $930.00 <br /> Exterior Windows <br /> Total Alternates $104,800.00 <br /> Upon a motion made by Mr.Littrell,seconded by Mr. Gilot and carried,the above bids were referred <br /> to the Division of Engineering and the Fire Department for review and recommendation. <br /> OPENING OF BIDS/AWARD BID - PEPPERS/IRONWOOD NORTH SANITARY SEWER <br /> EXTENSION - PROJECT NO. 10 1-0 12 (SEWER REVENUE BOND) <br /> This was the date set for receiving and opening of sealed bids for the above referred to project. The <br /> Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-County News <br /> which were found to be sufficient. The following bids were opened and publicly read: <br />
The URL can be used to link to this page
Your browser does not support the video tag.