Laserfiche WebLink
3 <br /> REGULAR MEETING OCTOBER 25, 2004 <br /> Alternate 12 Downspouts to Grade with -$2,800.00 <br /> Splash Blocks in Lieu of <br /> Underground Connection to <br /> Storm Drainage System <br /> Alternate 13 Flagpole and Base $2,300.00 <br /> Alternate 14 Floor Sealer $20,000.00 <br /> Alternate 15 Provide Pella Designer Series $3,500.00 <br /> Windows Hartford Green <br /> Exterior with Prefinished <br /> White Interior and Blinds in <br /> Between the Glass In Lieu of <br /> Anderson 400 Series <br /> Windows <br /> Alternate 16 One (1) Layer of Type "X" -$1,500.00 <br /> Gypsum Board at Exterior <br /> Walls In Lieu of Two (2) <br /> Layers <br /> Alternate 17 Horizontal Mini Blinds at $900.00 <br /> Exterior Windows <br /> Total Alternates $128,900.00 <br /> GIBSON-LEWIS, LLC <br /> 1001 West 11`h Street <br /> Mishawaka, Indiana 46544 <br /> Bid was signed by Mr. Robert Carpenter <br /> Non-Collusion Affidavit was in order <br /> Non-Discrimination Commitment form was completed <br /> Five per cent (5%) Bid Bond was submitted <br /> BID: $1,299,000.00 <br /> Alternates: <br /> Alternate 1 Exterior Storage Shed $34,950.00 <br /> Alternate 2 Emergency Generator $8,100.00 <br /> Enclosure Fence <br /> Alternate 3 Concrete Service Walk $3,900.00 <br /> Alternate 3A Landscaping at Concrete $700.00 <br /> Service Walk <br /> Alternate 4 Concrete Dining Patio $3,600.00 <br /> Alternate 4A Landscaping at Concrete $1,050.00 <br /> Dining Patio <br /> Alternate 5 Asphalt Service Drive $13,250.00 <br /> Alternate 6 Additional Parking Area and $15,100.00 <br /> Concrete <br /> Alternate 7 Landscaping for Additional $2,100.00 <br /> Parking Area <br /> Alternate 8 Landscaping at Building $3,100.00 <br /> Perimeter and Yards <br />