Laserfiche WebLink
REGULAR MEETING <br />Osceola, Indiana 46561 <br />AUGUST 13 2013 233 <br />Quotation was submitted by Mr. Scott Franko <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Employment Eligibility <br />Verification, Non -Discrimination Commitment for Contractors and Certification of Use <br />of United States Steel Products or Foundry Products was submitted <br />QUOTATION: $50,000.00 — Fully Illuminated <br />ALTERNATEI: $45,000.00 — Signs with Only P Logos Illuminated and Letters in <br />Reflective Vinyl <br />ALTERNATE 2: $37,000.00 — Signs with All Letters and Logos in Reflective Vinyl <br />NORTH AMERICAN SIGNS INC. <br />3601 West Lathrop Street <br />South Bend, Indiana 46628 <br />Quotation was submitted by Mr. Sean Denison <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Employment Eligibility <br />Verification, Non -Discrimination Commitment for Contractors and Certification of Use <br />of United States Steel Products or Foundry Products was submitted <br />QUOTATION: $59,069.87 <br />BURKHART ADVERTISING INC. <br />1247 Mishawaka Avenue <br />South Bend, Indiana 46615 <br />Quotation was submitted by Mr. Ryan Kring <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Employment Eligibility <br />Verification, Non -Discrimination Commitment for Contractors and Certification of Use <br />of United States Steel Products or Foundry Products was submitted <br />QUOTATION: $56,620,00 <br />ALTERNATEI: $51,818.51 <br />Upon a motion made by Mr. Mecham, seconded by Mr. Relos and carried, the above Quotations <br />were referred to Engineering and Downtown South Bend for review and recommendation. <br />OPENING OF QUOTATIONS — CURB AND SIDEWALK CONSTRUCTION 2013 CURB <br />AND SIDEWALK PROGRAM — PROJECT NO. 113-011D fMVH — CURB AND <br />SIDEWALK) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. The following Quotations were opened and read: <br />RIETH-RILEY CONSTRUCTION CO. INC. <br />PO Box 1775 <br />South Bend, Indiana 46614 <br />Quotation was submitted by Mr. Robert A. Nichols, II <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Employment Eligibility <br />Verification, Non -Discrimination Commitment for Contractors and Certification of Use <br />of United States Steel Products or Foundry Products was submitted <br />QUOTATION: <br />Item No. <br />1 <br />Description <br />Concrete Curb, Remove <br />Quantity <br />1272 lft <br />Unit Price <br />$15.00 <br />Total Amount <br />$19,080.00 <br />2 <br />3 <br />4 <br />Concrete Approve, Remove <br />Concrete Sidewalk, Remove <br />Concrete Curb Ramp, Remove <br />44 syd <br />220 syd <br />6 syd <br />$21.74 <br />$28.59 <br />$79.68 <br />$956.56 <br />$6,289.80 <br />$47808 <br />5 <br />Concrete Sidewalk, 4" <br />215 syd <br />$33.42 <br />$7,185.30 <br />6 <br />7 <br />Curb, Standard <br />Concrete Approach, 6" <br />1272 Ift <br />44 syd <br />$21.22 <br />$52.80 <br />$26,991.84 <br />$2,323.20 <br />8 <br />Concrete Curb Ramp, ADA <br />11 syd <br />1 $204.60 <br />$2,250.60 <br />Total <br />$65,555.38 <br />