My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 3154 approving and authorizing the execution of an addendum to the Master Agency Agreement (Hill & Colfax Drainage Improvements Project)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 3154 approving and authorizing the execution of an addendum to the Master Agency Agreement (Hill & Colfax Drainage Improvements Project)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 9:55:54 AM
Creation date
8/23/2013 2:53:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX A <br />WORK PLAN <br />PROJECT SCOPE <br />City of South Bend <br />Proposal for Engineering Services <br />Colfax & Hill Drainage Improvements <br />August 5, 2013 <br />Page 2 of 3 <br />The proposed project consists of eliminating an existing detention basin and drywell system <br />and providing a new detention storage facility while maintaining the current outlet rate to the <br />City drainage system. It is likely that the drywell structures in the adjacent parking lot are also <br />connected to this detention basin. The existing basin area is proposed to be redeveloped with <br />a building structure and parking. <br />SCOPE OF SERVICES <br />Based upon our understanding of the project goals and objectives, we propose to perform the <br />following services to assist the City with completing this community enhancement project: <br />Task #1: Field Survey <br />This work includes performing a topographic survey of the proposed. Prior to starting the field <br />survey, utility locates will be requested through Indiana 811 and utility maps will be requested <br />from the various utility companies. <br />Task #2: Preliminary Engineering <br />This work includes determining the allowable release rate through the existing outlet into the <br />City system and determining the storage required based on this release rate. We will provide <br />your office with options for the storage locations and methods for review and approval. The <br />methods may include drywells, perforated pipe, solid pipe or other subsurface storage. <br />Task #3: Construction Documents <br />This work includes preparing construction documents for the proposed project. We anticipate <br />these documents to include the City's standard cover sheet, maintenance of traffic if needed, <br />plan sheets and construction details. This task also includes preparing the complete bid or <br />quote package consisting of special provisions, front end requirements, calculating project <br />quantities, bid proposal, and developing an estimate of construction costs. <br />Task #4: Bid Period Services <br />This task includes answering bid questions, preparing addenda, if necessary, to the bid <br />documents, and tabulating the bids and making a recommendation of contract award. <br />
The URL can be used to link to this page
Your browser does not support the video tag.