Laserfiche WebLink
ya <br />582 sq yds of alleys graded <br />441 lin ft of street graveled <br />351 cu yds of gravel used <br />3,595 " " " dirt and trek removed <br />1 man hole built <br />597 man hours cutting and trimming trees <br />CITY COST <br />Proportionate cost of <br />lighting <br />25.12 <br />Proportionate cost of <br />labor expense <br />29.09 <br />Plow and tractor 22 hours ® 71¢ <br />1.77 <br />4 <br />witch forks <br />l picks <br />10.60 <br />4 <br />rakes <br />1 dipper <br />4.55 <br />3 <br />axes <br />1 padlock <br />4.65 <br />25 <br />shovels <br />2 sledges <br />36.40 <br />12 <br />picks <br />3 bells mason line <br />14.55 <br />3 <br />Tags <br />1 gush broom <br />.75 <br />l <br />nail <br />4 mattocks <br />.20 <br />2 <br />scythes <br />2 sacks cement <br />3.00 <br />1 <br />scythe stone <br />25 24" grade stakes <br />.20 <br />10 <br />balls mason line <br />TOTAL1 <br />1.50 <br />5 <br />grub hoes <br />6.25 <br />1 <br />padlock <br />.50 <br />10 <br />points <br />7.50 <br />7 <br />sledges <br />13.56 <br />1 <br />axe handle <br />.50 <br />1 <br />mattock <br />.54 <br />25 <br />24" stakes <br />.63 <br />50 <br />15" " <br />.90 <br />1 <br />wrecking b?r <br />. '0 <br />4 <br />lbs mails <br />.15 <br />2 <br />pick handles <br />1.00 <br />1 <br />toilet- <br />10.00 <br />4 <br />crow bars <br />1420 <br />5 <br />bags cement <br />2.20 <br />1 <br />hand saw <br />2.25 <br />4 <br />pcs 8" tile <br />2452 <br />5 <br />0 6n 0 <br />3.24 <br />1 <br />mPn hole ring_ and <br />cover <br />13:50 <br />300 <br />bricks <br />., <br />TOTAL <br />20 1 <br />GANG # 12 <br />0. C. Eulitz, supervisor <br />Grading and graveling streets in the vicinity of Colfax Avenue and Walnut Street <br />4 french drains built <br />615 sq ft of brick re -laid <br />3,292 sq gds of rough parade <br />65 man hours repairing curbs and UPON <br />5 loads of cinders spread in ?lleys <br />50 blacks of alleys fine graded. <br />22 If If streets fine graded <br />2,956 cu yds of dirt removed <br />CITY COST <br />Grpder furnished 34 hours @ 982¢ <br />33.49 <br />Plow and tractor furnished 9 hours a, <br />710 6439 <br />Proportionate cost of lighting <br />25.12 <br />Proportionate cost of labor expense <br />29.09 <br />4 red flags <br />.75 <br />l picks <br />17.36 <br />1 pail <br />.20 <br />1 dipper <br />.10 <br />1 tool box <br />15400 <br />1 padlock <br />450 <br />115 15" stakes <br />2407 <br />2 sledges <br />3496 <br />5 crow bars <br />1450 <br />3 bells mason line <br />.45 <br />2 axes <br />3410 <br />1 gush broom <br />1.00 <br />7 rakes <br />5.54 <br />4 mattocks <br />3.36 <br />1 tamp <br />1.50 <br />2 sacks cement <br />1.10 <br />4 barricades <br />6.00 <br />25 24" grade stakes <br />.63 <br />670 bricks <br />2.00 <br />TOTAL1 <br />.21 <br />JOB # 13 <br />Stanley Przyleyli-nski, supervisor <br />i <br />Grading and graveling streets and alleys in territory east of Miami end south of Indieana <br />11,192 sq yds of rough grade <br />5,31 " " " fine grade <br />2,99 cu " " dirt removed <br />125 " " " cinders spread on streets <br />693 " " " stone wall built <br />