Laserfiche WebLink
;4. <br />(CONTINUED FROM PAGE 349) <br />2,712 cu yds of gravel dug from pit and used on streets <br />55 cetch bPsine and manholes raised <br />1 " " built <br />CITY COST <br />Grader furnished 39 hours ®£?¢ <br />35.42 <br />Plow and tractor furnished ^.2 hours @71& <br />2.50 <br />Proportionate cost of lighting <br />25.12 <br />Proportionate " " 12bor expense <br />29.09 <br />16 sacks cement <br />5.50 <br />600 bricks <br />1.50 <br />2 pails <br />.40 <br />2 dippers <br />.20 <br />5 bells chalk line <br />1.20 <br />3 axes <br />4.65. <br />16 shovels <br />20.50 <br />100 15" grade stakes <br />1.50 <br />16 picks <br />19.54 <br />F pieces merking keil <br />.50 <br />1 lantern <br />1.10 <br />2 red flags <br />.50 <br />2 etch bssin covers and rings <br />13.50 <br />3 lbs nsils <br />.14 <br />1 toilet <br />10.00 <br />TOTAL <br />$153.96- <br />GANG # 2 <br />John Smoger, supervisor <br />Gr ^ding and graveling streets and. alleys in vicinity of N. Olive S +reet <br />101439 so yds of <br />1 1909 „ n <br />5,672 u a n <br />5,104 n if H <br />N15 . u n ►i <br />, 69 cu " <br />11443 ,r a n <br />91 s a <br />4 french dr <br />CITY COST <br />streets rough grad -ed <br />terrace rough graded <br />Streets fine wraded <br />terrace fine graded <br />streets groveled <br />dirt removed <br />gravel dug from nit end spread on streets <br />terrace built un <br />^ins built- <br />1 <br />Grader furnished 36 hours @ 952¢ <br />Plow, and tractor furnished 26 hours 0 716 <br />Proportionate cost of lighting <br />Proportionate cost of labor expense <br />100 24" grade stakes <br />17 shovels <br />1 Pxe <br />31 picks <br />5 rakes <br />2 crow bprt <br />2 mattocks <br />1 nick handle <br />1 brick tongs <br />1 trowel <br />1 sack cement <br />"DOTAL <br />John Smoger, supervisor <br />JOB # 3 <br />35.46 <br />1F,.46 <br />25.12 <br />29.09 <br />2.50 <br />22:.1550 <br />35.44 <br />6.10 <br />.60 <br />1.65 <br />.50 <br />2.00 <br />1.50 <br />:55 <br />$155.65 <br />Greding and. graveling streets and alleys north of L. W. W. and east of Olive Street. <br />No work report received for October up.to this time (Dec. 2) <br />CITY COST <br />12 picks <br />5 balls meson line <br />2 pcs merking keil <br />1 crow bar <br />1 scythe <br />1 scythe stone <br />50 24'1 stakes <br />12 15" If <br />2 bags cement <br />2 points <br />1 pPdlock <br />1 tool box <br />4 brick hemmers <br />3 send screens <br />6 stompers <br />6 brick tongs <br />100 12" stakes <br />14.55 <br />1.20 <br />.20 <br />1.50 <br />.10 <br />1.25 <br />.22 <br />1.10 <br />1.50 <br />•50 <br />15.00 <br />5.00 <br />6.00 <br />4.540 <br />5. <br />.50 <br />•J <br />WI <br />91 <br />01 <br />