Laserfiche WebLink
(CONTINUED FROTI PAGE 347) <br />23 tons of cold -pack asphalt used on above <br />109 blocks of streets and alleys graded <br />50 blocks of streets flushed <br />318 dead animals hauled to dump <br />36 emergency calls (brrken &ss etc.) <br />54o sq ft of asphalt pavement smoothed. with heater <br />34 streets signs repaired <br />trees cut down <br />loads of scrPp asphalt hauled to yard <br />42257 danger bombs set <br />4,374 large b- rricades placed <br />9-7677 small barricades placed <br />18 sewers repaired (cave -ins etc.) <br />5 main sewers flushed <br />8 private sewers flushed <br />42 manholes cleaned <br />6 if repaired <br />1,6gg catch basins cleaned <br />867 If If flushed <br />23 " " repaired <br />Respectfully <br />J. C. Weer, <br />Commissioner. <br />C01,PKISSTO -IPR OF STREETS <br />South Bend, Indiana <br />November 16, 1935 <br />TO THr HONORABLE BOARD OF PUELIC WORKS AND CITY COUNCIL <br />CITY OF SOUT J BEYD, I1,TDIkTA <br />HONORABLE -SIRS <br />submitted, <br />of Streets <br />Attached find report of W. P. A. activities and expense of same to the Street Department for the <br />month of October, 1935, per your request <br />Respectfully submitted, <br />J. C. Weer, <br />Commissioner of St.reets <br />W. P. A. ACCOUNT EXPET %TDITUBZES IN OCTOBER <br />1 wreck.ng bar <br />.45 <br />1 gross screws <br />.45 <br />9 files <br />2.10 <br />2 pr hinges <br />.45 <br />1 cross cut saw <br />5=.40 <br />1 hand saw <br />2.90 <br />2 lantern globes <br />.26 <br />hose connections <br />.20 <br />80bbls cement <br />173.60 <br />12gallons paint <br />36.60 <br />1 plow share <br />1.76 <br />1000 work report blanks <br />26.00 <br />10 doz rood rakes <br />195.80 <br />5 doz mattocks <br />S'2.50 <br />24 doz bells cholk line <br />36.00 <br />56 11 shovels <br />573.60 <br />2 If pitch forks <br />63:00 <br />7 kegs nails <br />31.10 <br />2 boxes keil <br />2.�5 <br />12 s?fety hasps <br />2. 0 <br />10 lbs roofing nails <br />.80 <br />1 doz padlocks <br />6.00 <br />24 hinges <br />0 <br />2.26 <br />10 peils <br />4 dippers <br />•40 <br />6 lanterns <br />6.60 <br />6 It globes <br />•g0 <br />3 pr hinges <br />1 gross screws <br />.40 <br />2 lugs end nuts <br />•90 <br />1 roll wire <br />4.00 <br />200 ft stove pipe wire <br />.20 <br />2 dippers <br />.20 <br />59 second hand drive shafts <br />14.50 <br />41,5?0.99 <br />PLOWING EXPENSE <br />Operator 159 hours @.44d- 69.96 <br />255 g?ilons gasoline 0.151 38.51 <br />19 ats oil C 12¢ 2.28 <br />1 lb grease .12 <br />Repairs 1 :63 <br />TOTAL 112.50 <br />Operator 15P2 hours. @ 44�t <br />354 gallons @ .151 <br />29 qts oil @ 12fi <br />2 lbs grease <br />Repn it s <br />TOTAL <br />GRADING EXPENSE <br />69.74 <br />53.45 <br />3.24 <br />29.23 <br />$156-14 <br />• <br />*I <br />* I <br />