My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
805 Arch Avenue_AA 2026-0625B
sbend
>
Public
>
Historic Preservation
>
2026
>
July
>
Administrative Approvals
>
805 Arch Avenue_AA 2026-0625B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2026 10:41:37 AM
Creation date
6/29/2026 10:41:11 AM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
805 Arch Avenue
HPC Document Type
Certification
HPC Local Historic District
ii. Edgewater Drive
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
805 Arch AvenueAddress:01 - Lead HazardsUnit: <br />General RequirementsLocation:0Approx. Wall SF: 0Ceiling/Floor SF:1 - <br />Spec Quantity Units Unit Price Total PriceSpec # <br />Trade: 219 Lead Abatement <br />The owner shall provide: <br />1. Utilities and sanitary facilities. <br />2. Remove all personnel items from work area. <br />3. All full and complete access to work areas. <br />4. Allow site access during normal work areas. <br />LBPGC12 1.00 DUSTABILIZE NON-LBP PAINT ________________ <br />Deteriorated non-LBP has been identified in association with the <br />structure. to ensure proper cleaning and prevent lead-dust <br />hazards from non-LBP that contains lead below HUD/EPA <br />regulatory limits, loose paint shall be adequately removed prior <br />to final cleaning. After establishing any required floor <br />containment with polyethylene sheeting, mist defective paint <br />area with water. Aggressively remove all loose paint or <br />deteriorate substrate with a stiff bristled brush or broom. <br />Contractor may elect to: Repair any damaged substrate and <br />spot prime areas of deteriorated non-LBP paint to ensure that <br />paint does not become loose prior to clearance. <br />Project will fail clearance if any paint chips, dust or debris are <br />identified, regardless of source. <br />Location Total:____________ <br />Page 3 of 27
The URL can be used to link to this page
Your browser does not support the video tag.