Laserfiche WebLink
71-08-12-304-001.000-026 Zion Hill Missionary Baptist Chu 310 MONROE 686, Exempt, Church, Chapel, Mosque, 18604 C132 /712 2/2 <br />General Information <br />Occupancy C/I Building Pre. Use Theater <br />Description C/I Building C 01 Pre. Framing Fire Resistant <br />Story Height 1 Pre. Finish Finished Open <br />Type N/A # of Units 0 <br />SB B 1 U <br />Wall Type 1: 2(226') <br />Heating 2680 sqft <br />A/C 2680 sqft <br />Sprinkler <br />RoofingPlumbing RES/CI <br />Built Up Tile Metal#TF #TF <br />Full Bath 0 0 0 0 <br />Half Bath 0 0 2 4 <br />Kitchen Sinks 0 0 <br />Water Heaters 0 0 <br />Add Fixtures 0 0 2 2 <br />Total 0 0 4 6 <br />Wood Asphalt Slate <br />Other <br />GCK Adjustments <br />Low Prof Ext Sheat Insulatio <br />SteelGP AluSR Int Liner <br />HGSR PPS Sand Pnl <br />Floor/Use Computations <br />Pricing Key <br />Use <br />Use Area <br />Area Not in Use <br />Use % <br />Eff Perimeter <br />PAR <br /># of Units / AC <br />Avg Unit sz|dpth <br />Floor <br />Wall Height <br />Base Rate <br />Frame Adj <br />Wall Height Adj <br />Dock Floor <br />Roof Deck <br />Adj Base Rate <br />BPA Factor <br />Sub Total (rate) <br />Interior Finish <br />Partitions <br />Heating <br />A/C <br />Sprinkler <br />Lighting <br />Unit Finish/SR <br />GCK Adj. <br />S.F. Price <br />Sub-Total <br />Unit Cost <br />Elevated Floor <br />Total (Use) <br />GCM <br />THEATRE <br />2680 sqft <br />0 sqft <br />100.0% <br />226' <br />8 <br />0 <br />-1 <br />1 <br />16' <br />$199.31 <br />$0.00 <br />($14.48) <br />$0.00 <br />$0.00 <br />$184.83 <br />1.00 <br />$184.83 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$184.83 <br />$0.00 <br />$0.00 <br />$495,344 <br />Exterior Features <br />Description Area Value <br />Special Features <br />Description Value <br />Other Plumbing <br />Description Value <br />Building Computations <br />Sub-Total (all floors)$495,344 Garages $0 <br />Racquetball/Squash $0 Fireplaces $0 <br />Theater Balcony $0 Sub-Total (building)$504,944 <br />Plumbing $9,600 Quality (Grade)$1 <br />Other Plumbing $0 Location Multiplier 0.90 <br />Special Features $0 Repl. Cost New $454,450 <br />Exterior Features $0 <br />Summary of Improvements <br />Description Story <br />Height <br />Constr <br />Type Grade Year <br />Built <br />Eff <br />Year <br />Eff <br />Age <br />Co <br />nd <br />Base <br />Rate LCM Adj <br />Rate Size RCN Norm <br />Dep <br />Remain. <br />Value <br />Abn <br />Obs PC Nbhd Mrkt Cap 1 Cap 2 Cap 3 Improv Value <br />1: C/I Building C 01 1 Concrete C 1900 1934 91 A 0.90 2,680 sqft $454,450 80%$90,890 0%100%1.000 1.000 0.00 0.00 100.00 $90,900 <br />Total all pages $90,900 Total this page $90,900