My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1- Madison Lifestyle District - New Parking Garage Proj No 123-074 FA Wilhelm
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Change Orders
>
Change Order No 1- Madison Lifestyle District - New Parking Garage Proj No 123-074 FA Wilhelm
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:35:15 PM
Creation date
4/28/2026 2:34:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/28/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PUBLIC WATER UTILITY DISTRIBUTION PIPING <br />2024.020254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 331413 - 9 <br />D. Thrust Restraints: <br />1. Provide pressure pipeline with restrained joints. At connection locations with existing <br />pipeline provide thrust blocking at bend adjacent to the connection to the existing <br />pipeline. <br />E. Corporation Stop Assemblies: <br /> <br />1. Make connection for each different kind of water main, using suitable materials, <br />equipment, and methods as approved by Engineer. <br />2. Provide service clamps for mains constructed of materials other than cast iron or ductile <br />iron. <br />3. Location: <br />1. Screw corporation stops directly into tapped and threaded iron main at 10- and 2- <br />o'clock positions along main's circumference. <br />2. Locate and stagger corporation stops at least 12 inches apart longitudinally. <br />4. Use seals or other devices such that no leaks are present in mains at points of tapping. <br />5. Do not backfill and cover service connections until installation has been approved by <br />Owner. <br />F. Backfilling: <br />1. This work shall be in accordance with all applicable sections of the City of South Bend <br />Section 5-3.9. These documents are available online at https://southbendin.gov/wp- <br />content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and <br />https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- <br />Specifications.pdf <br />G. Disinfection of Potable Water Piping Systems: <br />1. This work shall be in accordance with all applicable sections of the City of South Bend <br />Section 5-4.2. These documents are available online at https://southbendin.gov/wp- <br />content/uploads/2024/08/10.26.2021_SB_Construction_Standards.pdf and <br />https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- <br />Specifications.pdf <br />3.5 TOLERANCES <br />A. Section 01 40 00 - Quality Requirements: Requirements for tolerances. <br />B. Install pipe to indicated elevation within tolerance of 3 inch. <br />3.6 FIELD QUALITY CONTROL <br />A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for testing, adjusting, <br />and balancing. <br />B. Testing:
The URL can be used to link to this page
Your browser does not support the video tag.