Laserfiche WebLink
Proper ty Information <br />Property Address for Proposed Work:333 Tonti Street <br />Property City South Bend <br />Property Zip Code 46617 <br />Property Owner Information:Angel Cortes <br />Owner Email <br /> <br />Proposed Work and Project Information <br />All projects must comply with applicable building and zoning codes. <br />South Bend Zoning Ordinance St. Joseph County Zoning Ordinance <br />Does your project involve any of the <br />following? (Check all that apply):Roofs <br />Contractor Information Reliable Roofing & Construction General Construction Maddy <br />Weber <br />Contractor Phone Number (574) 302-7977 <br />Contractor Email maddy@reliableroofingonline.com <br />Description of Proposed Work: <br />This project includes the complete tear-off and replacement of the garage roof, along with any necessary <br />decking repairs and debris removal. We will begin by setting a dumpster in a predetermined location, <br />ideally as close to the work area as possible, and protecting the home and surrounding landscaping using <br />tarps and OSB/plywood to contain debris and ensure a clean, efficient process. All existing roofing <br />materials—including shingles, felt paper, and ice and water shield—will be removed down to the wood <br />decking, which will then be thoroughly inspected for any signs of rot or damage. If any 1x6 plank decking <br />is found to be split, weakened, or deteriorated, those sections will be removed and replaced with new <br />1x6x10 boards to provide a solid, stable surface for the new roofing system. Because the full condition of <br />the decking cannot be determined until tear-off is complete, the final quantity of replacement boards may <br />vary, and additional repairs could impact the final cost. Once the roof surface is properly prepared, we will <br />complete the professional installation of a new roofing system, including both labor and overhead. All <br />debris from the project will be loaded and hauled away using a 10-yard dumpster, which includes disposal <br />of up to three tons of material; any excess weight will incur an additional charge of $40 per ton. <br />Specification of Material via <br />Manufacture Brochure:PDF markate_invoice_….pdf <br />File Upload <br />Site Plans, Aerial Views, and/or Blueprints: One (1) set shall be submitted with the Application. <br />Uploaded documentation must show existing property lines, buildings, structures, and proposed project <br />3