Laserfiche WebLink
• <br /> . Step 1: Remove the portion of the Century Center Step 2: Connect the courthouse building, Town <br /> ' _ that houses the Bendix Theater and South Bend Square, and the signature riverfront park with the <br /> Museum of Art. river. <br /> Iii k . ,'•- ., ,_ . <br /> 0 o G // 1 �` ti <br /> f <br /> / d .' !:,ref,• 1 <br /> ' 2P': <br /> am: <br /> _ : _.` . \‘ <br /> --a�� Pedestrian <br /> rian connectivity is currently poor along the west side of the river.between E Colfax <br /> Avenue and Jefferson Boulevard.Interrupted largely by the Century Center .- <br /> Step 3: Build higher-density mixed-use housing on Step 4: Design the signature riverfront park as an _ <br /> the vacant parking lot across from the Town Square. integral part of the Larger open space network '. 1 - i <br /> ringing the river. 1 if, i , l 17.-- <br /> 1 <br /> 1 It ,4 p <br /> . lir.'0 I ill. <br /> - 11 / ;t r a+ <br /> EL filt..7 1 ,. L :- <br /> • <br /> �i <br /> w <br /> .-..._____-_ 19 ,_ <br /> Today.the riverfront trail system is well The signature riverfront park would <br /> - connected on the East Bank.but there is a connect the heart of Downtown to the river, <br /> a " gap Downtown at the Century Center completing the network of trails <br />