My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5C1 Budget Request (Riverwalk Imprvmnts. Seitz to Howard Phase 2) - Signed
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2026
>
03.26.2026
>
Signed Items
>
5C1 Budget Request (Riverwalk Imprvmnts. Seitz to Howard Phase 2) - Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2026 4:10:43 PM
Creation date
3/26/2026 4:10:42 PM
Metadata
Fields
Template:
Dept of Community Investment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend <br />Redevelopment Commission <br />215 S. Dr. Martin Luther King, Jr. Blvd., Room 301, South Bend, Indiana <br />Redevelopment Commission Agenda Item <br />DAT E : March 26th, 2026 <br />FROM: Patrick Sherman <br />Director of Project Management <br />SUBJECT: Budget Request- River Walk Improvements: <br />Seitz Park to Howard Park <br />Funding Source* (circle) River West; River East; South Side; Douglas Road; West Washington; RDC General; Riv. East Res. <br />*Funds are subject to the City Controller's determination of availability; if funds are unavailable, as solely determined by the City Controller, <br />then the authorization of the expenditure of such funds shall be void and of no effect. <br />PURPOSE OF REQUEST: <br />This budget request is for a total of $5.6M for the renovation and improvement of the river walk from the <br />newly developed Sietz Park to the City’s signature park, Howard Park. <br />SPECIFICS: <br />The river walk between Sietz Park and Howard Park is a heavily used section of wooden boardwalk that <br />needs to be replaced. The wood and wooden supports are deteriorating with age, and they sit on gabion <br />baskets along the river have been sinking over time creating an uneven trail surface. As the path <br />continues toward Howard Park under the Jefferson Bridge, the trail has awkward blind corners that are <br />not conducive to a safe and comfortable multi-use trail. <br />This project will replace this portion of river walk with a new 14’ wide, concrete multi-use trail, that will <br />be much more comfortable for users to use, and it will be supported by new piers for a long-lasting asset <br />for the community. The project also contains a new staircase on the north side of the bridge down to the <br />riverwalk from the bridge surface and replaces the concrete staircase that goes down to Howard Park on <br />the south side of the bridge to meet current design standards. <br />It is requested that the Redevelopment commission approves $4,000,000 from River East Residential TIF <br />and $1,600,000 from River East to cover the final design and construction of this portion of the riverwalk. <br />Thank you for your consideration of this request. <br />______________ ___________Pres/V-Pres <br />ATTEST: __________ ________Secretary <br />Date: _____________ _______ <br /> APPROVED Not Approved <br />SOUTH BEND REDEVELOPMENT COMMISSION <br />March 26, 2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.