Laserfiche WebLink
South Bend <br />Redevelopment Commission <br />215 S. Dr. Martin Luther King, Jr. Blvd., Room 301, South Bend, Indiana <br />Redevelopment Commission Agenda Item <br />DAT E : March 26, 2026 <br />FROM: Lidya Abreha <br />Project Engineer <br />SUBJECT: Budget Request- West Washington Mid-Block <br />Crossing Build <br />Funding Source* (circle) River West; River East; South Side; Douglas Road; West Washington; RDC General; Riv. East Res. <br />* Funds are subject to the City Controller's determination of availability; if funds are unavailable, as solely determined by the City Controller, <br />then the authorization of the expenditure of such funds shall be void and of no effect. <br />PURPOSE OF REQUEST: <br />This request is to fund a portion of the construction costs for the West Washington Mid-Block Crossing <br />project. <br />The project will build a permanent mid-block crossing on Washington Street by the Civil Rights Heritage <br />Center to facilitate safe pedestrian and bicycle crossings. It will follow the design concept tested in 2024 <br />with the temporary installation at the same location. This area of Washington experiences a high volume of <br />pedestrian crossings, and the project will significantly improve pedestrian safety. <br />Staff requests that the Redevelopment Commission approve $90,000 from West Washington TIF for the <br />project. The remaining funds are anticipated to come from public works. <br />SPECIFICS: <br />The project will build a concrete raised crossing for pedestrians and bicyclists as well as bumpouts to <br />narrow the crossing distance. <br />______________ ___________Pres/V-Pres <br />ATTEST: __________ ________Secretary <br />Date: _____________ _______ <br /> APPROVED Not Approved <br />SOUTH BEND REDEVELOPMENT COMMISSION <br />March 26, 2026 <br />