My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Madison Street Trail Connector Proj No 125-031 - Premium Concrete Service
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Opening of Bids
>
Opening of Bids - Madison Street Trail Connector Proj No 125-031 - Premium Concrete Service
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 2:56:10 PM
Creation date
3/10/2026 2:51:44 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/10/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Employee Request for Records. All employees have the right to request and obtain copies of any records <br />pertaining to the employee's use of alcohol and/or drugs, including records of the employee's DOT -mandated drug <br />and/or alcohol tests, and copies of SAP reports. Requests for records must be made in writing to the DER, A <br />laboratory must provide, within 10 business days of receiving a written request from an employee, and made <br />through the MRO, the records relating to the results of the employee's drug test (i.e., laboratory report and data <br />package). Service agents providing records may charge no more than the cost of preparation and reproduction for <br />copies of these records. SAPS must redact follow-up testing information from the report before providing it to the <br />employee. <br />6. Management Information System <br />Compliance. The Company will prepare and maintain the DOT Management Information System (MIS) report <br />for its drug and alcohol testing program. This report will be submitted to PHMSA in accordance with annual <br />submission requirements. If the Company uses a C/TPA then the C/TPA may prepare and maintain the MIS, <br />reporting the MIS as the Company requires. The DER will certify each report submitted by a C/TPA for accuracy <br />and completeness. The MIS report will be submitted electronically through the DAMIS portal on or before March <br />15tn <br />Contractor Reporting for MIS. If the Company is an operator, it will verify and identify all contractors who <br />performed covered functions, as defined under Part 199, for this Company in a given calendar year. If required, <br />by either mandated annual or PHMSA written request, the Company will submit an MIS report for each of these <br />contractors. The contractor MIS reports will be submitted electronically through the DAMIS portal on or before March <br />15th. <br />Premium Concrete Services, Enc.- PHMSA DRUG/ALCOHOL PLAN 37 <br />NATIONAL CUMPUAdCE M4,14A.GE`,IE611 SERVICE HNC (NCM1S)2011 (upa c 2021j Tha NcMS plan L% <br />rhn 9nhinm of i mnkiorml c winhl An rl nrntnnrnrt by rnnurinhl lawn in rhP-I I S and rlanvihnm All lim}ilc <br />
The URL can be used to link to this page
Your browser does not support the video tag.