My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Demolition of 921 Louise Street Proj No 125-043A - KLF Enterprises
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Opening of Bids
>
Opening of Bids - Demolition of 921 Louise Street Proj No 125-043A - KLF Enterprises
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 2:46:33 PM
Creation date
3/10/2026 2:45:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/10/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AVE 2300 w 167" ST <br />TEL: 708.331.4200 <br />ENTERPRISES <br />PART II <br />SECTION I — EXPERIENCE QUESTIONNAIRE <br />#1 Refer to attached documentation. <br />#2 Refer to attached documentation. <br />• MARKHAM, IL 60428 <br />• FAX: 708,331.4212 <br />#3 KLF Enterprises has successfully completed all projects that the company has bid and been <br />awarded. The company has not failed to perform or complete any contract awarded to it. <br />#4 Please see the attached reference list. <br />SECTION II — PLAN AND EQUIPMENT QUESTIONNAIRE <br />#1 KLF Enterprises will mobilize personnel and equipment to the project site to perform an <br />initial site review and confirm all pre -demolition requirements have been satisfied. This includes <br />verification that utilities have been properly disconnected, required abatement work has been <br />completed ,and the structure has been secured and cleared of occupants or unauthorized <br />individuals. Temporary safety and site protection measures will be installed as necessary around <br />the project area. <br />Demolition activities will proceed in a controlled manner, generally working from the upper <br />portions of the structure downward. Materials suitable for recycling or salvage will be separated <br />in accordance with project specifications. Structural elements including concrete and masonry <br />will be demolished and removed from the site. Any below -grade removals will be properly <br />backfilled and compacted as required. Upon completion of demolition operations, the site will be <br />restored by importing topsoil, grading the area, and completing final seeding. <br />#2 Subcontractors <br />AMS Elite Solutions (Trucking / Hauling / WBE) <br />1862 E Belvidere, Grayslake IL 60030 <br />l st Class Logistics (Trucking / Hauling / MBE) <br />2213 Saint Charles Ave <br />South Bend, IN 46614 <br />
The URL can be used to link to this page
Your browser does not support the video tag.