My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Main St Housing Parking Garage Proj No 125-065 - Larson-Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Main St Housing Parking Garage Proj No 125-065 - Larson-Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 2:42:51 PM
Creation date
3/10/2026 2:42:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/10/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LARSON-DANIELSON PROPOSAL FOR CMc SERVICES MORRIS PERFORMING ARTS CENTER PARKING GARAGE 23 <br />PROJECT COSTS <br />PRE-CONSTRUCTION SERVICES FEE <br />Larson-Danielson Construction proposes the following fee <br />to provide CMc pre-construction services, which includes <br />estimating and bid procurement, design consultation and <br />review, scheduling, value engineering, community outreach, site <br />logistics and phasing planning, and general pre-construction <br />coordination. <br />CMC FEE <br />Larson-Danielson Construction proposes the following <br />percentage-based fee for Construction Phase Services, which <br />covers Larson-Danielson overhead and profit, and is based a <br />project budget of $15 million. <br />OWNER COSTS <br />The following is a summary of project-related items the owner <br />would be responsible for: <br />• Legal survey – contours, structures, utilities, rights-of-way, <br />easements, legal description, etc. <br />• Environmental assessments and reports <br />• Furniture, fixtures, and equipment not permanently <br />anchored to the site or building(s) <br />• Geotechnical investigations and reports <br />• Impact and development fees <br />• Zoning and variance expenses <br />• State design release <br />• Utility connection fees <br />• Insurance – Builder’s Risk <br />• Professional quality assurance, quality control and testing <br />services <br />• Temporary power, natural gas, water, and sewer bills <br />• Temporary utility connections. <br />$15,000 <br />3.25 %
The URL can be used to link to this page
Your browser does not support the video tag.