|
Project Name: Marion Street Pedestrian BridgeNo. Description Qty Unit Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost1 CONSTRUCTION ENGINEERING 1.00 LS$50,000.00 $50,000.00 $75,000.00 $75,000.00 $94,000.00 $94,000.002 CONSTRUCTION ACCESS 1.00 LS$520,000.00 $520,000.00 $775,000.00 $775,000.00 $114,000.00 $114,000.003 MOBILIZATION AND DEMOBILIZATION 1.00 LS$220,000.00 $220,000.00 $190,000.00 $190,000.00 $193,000.00 $193,000.004 CLEARING RIGHT-OF-WAY 1.00 LS$30,000.00 $30,000.00 $72,370.00 $72,370.00 $72,000.00 $72,000.005 SIDEWALK REMOVAL 271.00 SYS$30.00 $8,130.00 $39.30 $10,650.30 $10.00 $2,710.006 CURB, CONCRETE, REMOVE 195.00 LFT$8.00 $1,560.00 $32.75 $6,386.25 $10.00 $1,950.007 CONTAMINATED SOIL, REMOVE AND DISPOSE 45.00 CYS$240.00 $10,800.00 $240.00 $10,800.00 $120.00 $5,400.008 FENCE AND POSTS, REMOVE 1.00 LS$15,000.00 $15,000.00 $11,917.45 $11,917.45 $10,000.00 $10,000.009 EXCAVATION, COMMON 1120.00 CYS$56.00 $62,720.00 $91.20 $102,144.00 $50.00 $56,000.0010 STORMWATER MANAGEMENT BUDGET 20000.00 DOL$1.00 $20,000.00 $1.45 $29,000.00 $1.00 $20,000.0011 STORMWATER MANAGEMENT IMPLEMENTATION 1.00 LS$5,000.00 $5,000.00 $48,000.00 $48,000.00 $10,000.00 $10,000.0012 EXCAVATION, WET 185.00 CYS$150.00 $27,750.00 $159.00 $29,415.00 $149.79 $27,711.1513 EXCAVATION, FOUNDATION, UNCLASSIFIED 83.00 CYS$71.00 $5,893.00 $168.00 $13,944.00 $103.29 $8,573.0714 COFFERDAM 1.00 LS$150,000.00 $150,000.00 $135,000.00 $135,000.00 $332,000.00 $332,000.0015 SUBGRADE TREATMENT, TYPE III 140.00 SYS$7.00 $980.00 $34.22 $4,790.80 $5.00 $700.0016 B BORROW 867.00 CYS$63.00 $54,621.00 $65.90 $57,135.30 $67.14 $58,210.3817 AGGREGATE FOR END BENT BACKFILL 31.00 CYS$200.00 $6,200.00 $613.45 $19,016.95 $174.86 $5,420.6618 STRUCTURE BACKFILL, TYPE 2 50.00 CYS$110.00 $5,500.00 $97.20 $4,860.00 $80.00 $4,000.0019 STRUCTURE BACKFILL, TYPE 3 676.00 CYS$180.00 $121,680.00 $103.85 $70,202.60 $111.58 $75,428.0820 GEOTEXTILE FOR PAVEMENT, TYPE 2B 44.00 SYS$12.00 $528.00 $113.95 $5,013.80 $16.74 $736.5621 COMPACTED AGGREGATE, NO. 53 171.00 CYS$200.00 $34,200.00 $160.10 $27,377.10 $130.00 $22,230.0022 SUBBASE FOR PCCP 11.00 CYS$260.00 $2,860.00 $685.15 $7,536.65 $286.51 $3,151.6123 HMA PATCHING, FULL DEPTH, TYPE A 47.00 TON$320.00 $15,040.00 $861.25 $40,478.75 $320.00 $15,040.0024 FENCE, BLACK COATED METAL 317.00 LFT$106.00 $33,602.00 $106.00 $33,602.00 $140.00 $44,380.0025 FENCE RAIL, WOOD 309.00 LFT$94.82 $29,299.38 $100.00 $30,900.00 $110.00 $33,990.0026 SIDEWALK, CONCRETE 535.00 SYS$80.00 $42,800.00 $72.40 $38,734.00 $100.00 $53,500.0027 REINFORCED CONCRETE BRIDGE APPROACH, 10 IN. 44.00 SYS$270.00 $11,880.00 $175.20 $7,708.80 $311.07 $13,687.0828 GEOTEXTILE FOR RIPRAP, TYPE 1A 65.00 SYS$3.00 $195.00 $105.90 $6,883.50 $21.01 $1,365.6529 TOPSOIL 2.00 CYS$172.00 $344.00 $1,117.70 $2,235.40 $90.00 $180.0030 SODDING, NURSERY 12.00 SYS$232.00 $2,784.00 $232.00 $2,784.00 $12.00 $144.0031 DYNAMIC PILE LOAD TEST 1.00 EACH$8,100.00 $8,100.00 $10,100.00 $10,100.00 $4,809.38 $4,809.3832 TEST PILE, DYNAMIC, PRODUCTION 62.00 LFT$135.00 $8,370.00 $166.00 $10,292.00 $82.23 $5,098.2633 TEST PILE, INDICATOR, PRODUCTION 98.00 LFT$170.00 $16,660.00 $159.00 $15,582.00 $120.08 $11,767.8434 TEST PILE, DYNAMIC, RESTRIKE 1.00 EACH$5,500.00 $5,500.00 $1,370.00 $1,370.00 $4,906.82 $4,906.8235 TEST PILE, INDICATOR, RESTRIKE 2.00 EACH$2,500.00 $5,000.00 $1,370.00 $2,740.00 $2,719.64 $5,439.2836 CONICAL PILE TIP, 14 IN. 25.00 EACH$605.00 $15,125.00 $590.00 $14,750.00 $544.23 $13,605.7537 PILE, STEEL PIPE, 0.5 IN., DIAMETER 14 IN. 1050.00LFT$180.00 $189,000.00 $166.00 $174,300.00 $120.21 $126,220.5038 CONCRETE, A, SUBSTRUCTURE 72.70 CYS$2,600.00 $189,020.00 $1,875.00 $136,312.50 $1,446.14 $105,134.3839 CONCRETE, B, FOOTINGS 31.20 CYS$800.00 $24,960.00 $790.00 $24,648.00 $1,023.44 $31,931.3340 CONCRETE, FOUNDATION SEAL 50.20 CYS$600.00 $30,120.00 $760.00 $38,152.00 $496.88 $24,943.3841 REINFORCING BARS, EPOXY COATED 29976.00 LBS$2.58 $77,338.08 $2.25 $67,446.00 $1.79 $53,657.0442 THREADED TIE BAR ASSEMBLY, EPOXY COATED 16.00 EACH$51.28 $820.48 $50.00 $800.00 $60.82 $973.1243 SEAL COAT GRAFFITI RESISTANT 4570.00 SFT$4.00 $18,280.00 $4.00 $18,280.00 $4.71 $21,524.7044 PIPE, TYPE 4, CIRCULAR, DIAMETER 6 IN. 311.50 LFT$7.00 $2,180.50 $16.70 $5,202.05 $17.53 $5,460.60Engineer's EstimateFor Bids Due: February 24, 2026Lochgroup Project No: 123-3051-00BMilestone Contractors North, Inc.24358 SR 23South Bend, IN 4661425200 IN 23South Bend, IN 46628Bid Tabulation for Bids Received Project No: 123-060Rieth-Riley Construction Co., Inc.03/02/2026
|