Laserfiche WebLink
BID TABULATION #123-010 <br />121 SHREDDED HARDWOOD MULCH 0 6.00 CYS $60.00 $360.00 $117.00 $702.00 $128.00 $768.00 $95.00 $570.00 <br />122 PIPE, TYPE 2, CIRCULAR, DIAMETER 18 IN.0 125.00 LFT $100.00 $ 12,500.00 $92.00 $ 11,500.00 $135.00 $ 16,875.00 $108.54 $ 13,567.50 <br />123 PAVEMENT MARKING LINE, REMOVE 0 200.00 LFT $2.00 $400.00 $1.50 $300.00 $1.35 $270.00 $1.35 $270.00 <br />124 LINE STOP, 6 IN. WATER 0 4.00 EACH $5,000.00 $ 20,000.00 $5,000.00 $ 20,000.00 $12,800.00 $ 51,200.00 $9,042.97 $ 36,171.88 <br />125 LINE STOP, 8 IN. WATER 0 2.00 EACH $6,000.00 $ 12,000.00 $5,250.00 $ 10,500.00 $13,200.00 $ 26,400.00 $9,278.98 $ 18,557.96 <br />126 B-BORROW FILL, UNDISTRIBUTED 0 500.00 CYS $70.00 $ 35,000.00 $48.60 $ 24,300.00 $78.00 $ 39,000.00 $47.23 $ 23,615.00 <br />BASE BID TOTAL $ 3,445,372.75 $ 3,841,559.17 $ 3,898,000.00 $ 3,765,854.00 <br />I hereby certify that the above truly and accurately represents bids received for this project on February 25, 2026 <br />Mike Voll, Professional Engineer <br />ALTERNATE 1 AT CASCADES <br />Item No. Line Item Prev Qty Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost <br />36 SIDEWALK, PAVERS 305 305 SYS $305.00 $ 93,025.00 $326.90 $ 99,704.50 $425.00 $ 129,625.00 $380.00 $ 115,900.00 <br />44 SODDING, NURSERY AND TOPSOIL - DEDUCT -305 -305 SYS $35.00 $ (10,675.00)$21.31 $ (6,499.55)$35.00 $ (10,675.00)$27.96 $ (8,527.80) <br />46 TREE GRATE 9 9 EACH $6,500.00 $ 58,500.00 $5,100.00 $ 45,900.00 $6,700.00 $ 60,300.00 $4,653.20 $ 41,878.80 <br />ALTERNATE 1 TOTAL $ 140,850.00 $ 139,104.95 $ 179,250.00 $ 149,251.00 <br />Engineer's Estimate Indiana Earth Milestone Contractors Rieth Riley Construction <br />Milestone Contractors Rieth Riley Construction <br />YES <br />YES <br />YES <br />YES <br />YES <br />YESNon-Collusion Affidavit YES <br />Engineer's Estimate Indiana Earth <br />YES <br />YES <br />YES <br />YES <br />Responsible Bidder Documentation & Letter YES <br />Bid Bond YES <br />MWBE Goals Met YES <br />MWBE Good Faith Effort YES <br />J:\Projects\2021 Projects\2021-0489\00_Colfax\14_Bidding\Bid Tabulation\123-010 JPR Bid Tabulation 2026-02-25.xlsx