<br /> <br />Page 2 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />8. Revise the Report and any other deliverables in response to Owner’s comments, as <br />appropriate, and furnish copies of the revised Report and any other deliverables to the <br />Owner within calendar days of receipt of Owner’s comments. <br />B. Engineer’s services under the Study and Report Phase will be considered complete on the date <br />when the revised Report and any other deliverables have been delivered to Owner. <br />A1.02 Preliminary Design Phase <br />A. After acceptance by Owner of the Report and any other deliverables, selection by Owner of a <br />recommended solution and indication of any specific modifications or changes in the scope, extent, <br />character, or design requirements of the Project desired by Owner, and upon written authorization <br />from Owner, Engineer shall: <br />1. Prepare Preliminary Design Phase documents consisting of final design criteria, <br />preliminary drawings, outline specifications, and written descriptions of the Project. <br />2. Provide necessary field surveys and topographic and utility mapping for design purposes. <br />Utility mapping will be based upon information obtained from utility owners. <br />3. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />4. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various <br />cost categories which comprise Total Project Costs. <br />5. Perform or provide the following additional Preliminary Design Phase tasks or <br />deliverables: [here list any such tasks or deliverables] <br />a. Participation in and documentation of two (2) meetings <br />1) One (1) in-person meeting which includes the Project Kick Off and a Site Visit with <br />our engineers to review current site and electrical conditions <br />2) One (1) virtual meeting <br />b. Preliminary Project Code Review & ADA Study <br />c. Initial Flood plain studies and conversations with the Army Core of Engineers and the <br />Department of Natural Resources <br />d. Preliminary Cost Estimate with options for additional stage square footage and addition <br />of a restroom <br />e. Project Schedule <br />f. PDP Documents Set to Core Team