My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Walker Fieldhouse Shelter Proj No 125-044 - KW Garner Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to PSA - Walker Fieldhouse Shelter Proj No 125-044 - KW Garner Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 2:36:32 PM
Creation date
3/10/2026 2:36:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/10/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated January 14, 2025. <br /> <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. 1 <br /> <br />1. Background Data: <br /> <br />a. <br /> <br />Effective Date of Owner-Engineer Agreement: <br /> <br />January 14, 2025 <br /> <br />b. <br /> <br />Owner: <br /> <br />Board of Public Works, City of South Bend, IN <br /> <br />c. <br /> <br />Engineer: <br /> <br />K.W. Garner Consulting & Desing <br /> <br />d. <br /> <br />Project: <br /> <br />Walker Field Shelterhouse Restoration Project - 2025 <br /> <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) Revise previous drawings to include helical piers as existing components of the <br />structure <br />2) Revise previous drawings to include new steel frames and masonry repairs <br /> <br /> <br />3. Agreement Summary (Reference only) <br /> a. Original Agreement amount: $5,000 <br /> b. Net change for prior amendments: $0 <br /> c. This amendment amount: $600 <br /> d. Adjusted Agreement amount: $5,600 <br /> <br />The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, <br />including those set forth in Exhibit C. <br /> <br />Owner and Engineer hereby agree to modify the above-referenced Agreement as set forth in this <br />Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in <br />effect. The Effective Date of this Amendment is the date of the latest required signature. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.