Laserfiche WebLink
Intermediate Semitrailer - WB-50 <br />OHE <br />OHE <br />*** <br />************************************D**** <br />************** <br />* <br />***********6 <br />7 <br />6 <br />. <br />4 <br />2 <br />' <br />B <br />sm <br />t <br /> <br />S <br />l <br />a <br />b GUARD RAILS+/- 76,000 SF 7-STORY8"PVC @ 1.0%PROP. CONST. ESMT.FDC <br />x686.21GINTZ DRIVE <br />VAN8" PVC at 0.53%TO CITY MH-640PHASE 1EXISTING BUILDINGNOT IN CONTRACTBRIDGE ABUTMENT WALLSYCAMORE ST.687.25 FF.= 100.00FDC <br />NILES AVE.LASALLE AVENUECOLFAX AVENUE (82.5' R/W)WVGeneratorEXISTINGCOLUMNX <br />STORAGE <br />CONTAINER <br />STORAGE <br />CONTAINER <br />STORAGE <br />CONTAINERXXXXXXXXXXXXXCONSTRUCTIONTRAILERWILLSCOT FLEXX X X X X 136'-0"322'-0"382'-0"10'-0"1 <br />0 <br />' <br />- <br />0 <br />"4'-0"140'-0"10'-0"35'-0"12'-0"20'-4"INDICATES PROPOSED AREA OF THERIGHT OF WAY TO BE OCCUPIEDDURING CONSTRUCTION.TRAVEL KEYVEHICULARPEDESTRIANSheetOfReproduction or use withoutexpress written consent isprohibited.BUILDING CORPORATIONDate416 East Monroe StreetSuite 320South Bend, IN 46601574.234.0124500525Project #File #Job DescriptionPanzicaConstructionGroup312 East Colfax Avenue at the St. Joseph River <br />South Bend, Indiana 46617www.panzica.netMixed Use DevelopmentRevisionsThese drawings are property ofPanzica Building Corp.Copyright © 2026 All rights reservedThese drawings are property of Panzica Building Corporation 1"1/2"0 2"SCALE: 1" = 40'20'40'080'1SCALE 1" = 40'TRAFFIC CONTROL SIGNAGE PLANTraffic Control Signage PlanC104-OPJanuary 12, 20262'x10' CONCRETEBARRICADES w/ TEMPCONSTRUCTION FENCING312 AT THE CASCADECONSTRUCTION ZONE.NEW "SHIFTLANE" SIGN.NEW "UTILITYWORK AHEAD"SIGN.NEW "ROADCONSTRUCTIONAHEAD" SIGN.NEW "ROADCONSTRUCTIONAHEAD" SIGN.360'-0"CONSTRUCTIONSITE ACCESS.ACCESS TOTHE CASCADEANDSTEPHENSON MILLSNOTES:1. CONTRACTOR SHALL COORDINATE WITH BUSINESSES ANDRESIDENTS LOCATED ALONG COLFAX AVENUE TO PROVIDE ACCESSAT ALL TIMES. CONSTRUCTION AT DRIVEWAYS AND IMMEDIATELY INFRONT OF BUSINESSES AND RESIDENCES SHALL BE COORDINATEDA MINIMUM OF ONE WEEK IN ADVANCE. EITHER THE NILES AVENUEOR SYCAMORE STREET INTERSECTION SHALL REMAIN OPEN FORLOCAL BUSINESS, RESIDENTIAL AND CONSTRUCTION ACCESS.2. LOCATION OF SIGNS SHALL BE DETERMINED BY CITY OF SOUTHBEND, CONTRACTOR CONSTRUCTION SCHEDULE ANDCOORDINATED WITH CORRESPONDING BUSINESSES.SIDEWALK CLOSED ATTHE CASCADECONSTRUCTION ZONE.SIDEWALK TO REMAINOPEN ON NORTH SIDEOF COLFAX AVENUE.ACCESS TO RIVER WALKTO REMAIN OPEN.NO PARKING OR TRUCKSTAGING ON BRIDGE DECKNO PARKING ON THIS SIDEOF STREET FOR TRUCKACCESS, QUEUING ANDDELIVERIES.CONDO AND VISITOR ACCESSDURING CONSTRUCTIONWORK HOURS.GUEST PARKING ANDLOWER LEVEL CONDOPARKING FOR CONDOOWNERS.TRADE PARKING DURINGCONSTRUCTION HOURS.SIDEWALK <br />CLOSEDNEW "SIDEWALK CLOSED" SIGNTO DIRECT PEDESTRIANS TOCROSS TO UNOBSTRUCTEDSIDE OF ROADWAY.ROW OCCUPANCYPERMIT TO NORTH LINEOF BICYCLE LANE.ROW OCCUPANCYPERMIT.TALL CONES ANDFLAGGING DURINGCONSTRUCTION HOURS.SIDEWALKCLOSEDNEW "SIDEWALK CLOSED" SIGNTO DIRECT PEDESTRIANS TOCROSS TO UNOBSTRUCTEDSIDE OF ROADWAY.CONSTRUCTIONSITE ACCESSSIGN DURINGDAY ONLY.SIDEWALK TO REMAINOPEN ON NORTH SIDEOF COLFAX AVENUE.1Rev 1Feb 2, 2026. Add notes111