My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1. 414 North William Street_COA 2025-0310B PACKET
sbend
>
Public
>
Historic Preservation
>
2026
>
March
>
1. 414 North William Street_COA 2025-0310B PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 2:38:41 PM
Creation date
3/10/2026 9:40:40 AM
Metadata
Fields
Template:
South Bend HPC
Text box
ID:
1
Creator:
Created:
3/10/2026 9:41 AM
Modified:
3/10/2026 9:41 AM
Text:
https://docs.southbendin.gov/WebLink/Browse.aspx?dbid=0,0&startid=291740&row=1&cr=1
ID:
2
Creator:
Created:
3/10/2026 9:41 AM
Modified:
3/10/2026 9:41 AM
Text:
https://www.sjcindiana.com/DocumentCenter/View/27087/1132023-St-Joseph-County-Zoning-Ordinance---Compiled?bidId=
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Proper ty Information <br />Property Address for Proposed Work:414 North Williams St. <br />Property City South Bend <br />Property Zip Code 46601 <br />Property Owner Information:Lawrence (Larry) H. Garatoni <br />Owner Email <br /> <br />Owner Address <br />Proposed Work and Project Information <br />All projects must comply with applicable building and zoning codes. <br />South Bend Zoning Ordinance St. Joseph County Zoning Ordinance <br />Does your project involve any of the <br />following? (Check all that apply):Demolition <br />Contractor Information Majority Builders INC Demolition Tyler Martis <br />Contractor Phone Number (574) 276-7733 <br />Contractor Email tylerm@majoritybuilders.com <br />Description of Proposed Work: <br />The scope of work for this demolition project includes the following. All brush and trees on the site will be <br />cleared first, ensuring the area is prepared for demolition. Once the site is cleared, the existing house and <br />foundation will be completely demolished in accordance with local codes and regulations. All debris from <br />the demolition will be removed. After demolition, the site will be graded to ensure a level and stable <br />surface, preparing the area for future development or use. Finally grass will be planted to establish ground <br />cover. <br />File Upload <br />3
The URL can be used to link to this page
Your browser does not support the video tag.