My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
508 W Washington_AA 2026-0106A
sbend
>
Public
>
Historic Preservation
>
2026
>
January
>
Administrative Approvals
>
508 W Washington_AA 2026-0106A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2026 3:57:48 PM
Creation date
1/13/2026 3:55:23 PM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Certification
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#Services Qty Price Discount Tax Total <br />Full EPDM Removal • New ISO • Fully Adhered TPO • Metal • Chimneys • OSB Repairs <br />This line item includes the complete replacement of 2,200 sq. ft. (22 squares) of roofing. All work follows <br />manufacturer specifications and industry standards. <br />Scope of Work <br />Remove the complete existing EPDM roofing system, including membrane, flashings, and all deteriorated <br />components <br />Install new 1" ISO board, mechanically fastened using 3-1/4" fasteners <br />Install new fully adhered TPO membrane (labor + materials) <br />Replace all perimeter metal drip edge <br />Install 2 new pipe boot flashings <br />Flash and counter-flash 3 chimneys <br />East chimney brick repair included (missing/damaged bricks will be replaced) <br />Replace up to 10 sheets of OSB at no additional labor cost <br />Material cost only: $70 per sheet (included below) <br />Any OSB beyond 10 sheets will be billed as needed <br />Special Pricing <br />Chimney counter-flashing at half price <br />Labor for chimney counter flashing: $250 per chimney <br />OSB replacement labor is free (up to 10 sheets) <br />Pricing Breakdown <br />1. TPO Roofing System (2,200 SQF @$15/SQF Adjusted to $11/SQF) <br />$24,200.00 <br />2. Chimney Counter Flashing (3 @ $250 each) <br />$750.00 <br />3. OSB Material (10 sheets @ $70 each) <br />$700.00 <br />(Included assuming all 10 are used; can list as “if needed” instead.) <br />Total Project Cost: <br />$25,650.00 <br />Subtotal $25,650.00 <br />Wood Discount -$782.00 <br />Grand Total ($)$24,868.00 <br />Deposit Due $14,920.80 <br />Payment Schedule <br />Deposit (60.00%)$14,920.80
The URL can be used to link to this page
Your browser does not support the video tag.