My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Long Tern Control Plan Proj No 124-039 - Stantec
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to PSA - Long Tern Control Plan Proj No 124-039 - Stantec
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 11:29:24 AM
Creation date
12/17/2025 11:29:22 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/17/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />AMENDMENT NO. 1 TO AGREEMENT <br /> FOR PROFESSIONAL CONSULTING SERVICES BETWEEN THE <br />BOARD OF PUBLIC WORKS, CITY OF SOUTH BEND, INDIANA AND <br />STANTEC CONSULTING SERVICES, INC. <br />RANDOLPH-SAMPSON RETENTION TREATMENT BASIN <br />This Amendment No. 1 to the Agreement Between Board of Public Works, City of South Bend, Indiana and <br />Stantec Consulting Services, Inc. dated November 12, 2024 (“Agreement”) is made and entered into this <br />16th day of December, 2025. <br />Whereas, Stantec Consulting Services, Inc. (“Engineer”) and the Board of Public Works, City of South Bend, <br />Indiana (“Owner”) did enter into a written Agreement on November 12, 2024 whereby Engineer agreed to <br />perform engineering services; and <br />Whereas, it is the desire of the parties to enter into this Amendment No. 1 to the Agreement under which <br />the Consultant agrees to perform additional study/preliminary engineering, preliminary design, and 60% <br />design services for the Randolph-Sampson Retention Treatment Basin. <br />Now therefore, for and in consideration of the covenants and agreements herein set forth, it is agreed by <br />and between the parties hereto, that the said Agreement is hereby amended in the following particulars: <br />1. The original Exhibit A – Engineering Services for Randolph-Sampson Retention Treatment Basin <br />is amended to include the Additional Engineering Services for Randolph-Sampson Retention <br />Treatment Basin included with this Amendment as Exhibit A1. <br />2. The original Compensation Packet BC-1: Basic Services – Lump Sum is modified as shown below <br />to include the basis of compensation for the new scope of services authorized under this <br />Amendment No. 1. The Total, Lump Sum compensation is hereby increased to $3,069,259 as <br />indicated below: <br />Original <br />Agreement <br />Amendment 1 Total <br />a. Study/PER Phase $1,322,000.00 $0.00 $1,322,000.00 <br />b. Preliminary Design Phase $TBD $1,521,656.00 $1,521,656.00 <br />c. Final Design Phase $TBD $225,603.00 $225,603.00 <br />d. Bidding and Negotiating Phase $TBD $TBD $TBD <br />e. Construction Phase $TBD $TBD $TBD <br />f. Post-Construction Phase $TBD $TBD $TBD <br />3. The Period of Service defined in the original Compensation Packet BC-1 is amended to a total <br />duration of 20 months, ending in June 30, 2026.
The URL can be used to link to this page
Your browser does not support the video tag.