My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Dylan Drive Lighting Improvements Proj No 119-047 - Michiana Contracting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Award Bids
>
Award Bid - Dylan Drive Lighting Improvements Proj No 119-047 - Michiana Contracting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2025 1:34:13 PM
Creation date
11/25/2025 1:33:37 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/25/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ti <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Dylan Drive Lighting Improvements <br />Project Number: 119-047 <br />For Bids Due: November 12, 2025 <br />Contractor Name: Michiana Contracting, Inc. <br />BASE BID <br />Item No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONSTRUCTION ENGINEERING <br />1 <br />LS <br />$1,200.00 <br />$1,200.00 <br />2 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LS <br />$14,240.00 <br />$14,240.00 <br />3 <br />LIGHT POLE FOUNDATION REMOVAL <br />1 <br />EA <br />$300.00 <br />$300.00 <br />4 <br />LIGHT STANDARD, TYPE B <br />1 <br />EA <br />$7,600.00 <br />$7,600.00 <br />5 <br />LIGHT STANDARD, TYPE D <br />1 <br />EA <br />$13,900.00 <br />$13,900.00 <br />6 <br />LIGHT STANDARD, REPLACEMENTTYPEA <br />15 <br />EA <br />$1,840.00 <br />$27,600.00 <br />7 <br />LIGHT STANDARD, LED UPGRADE TYPE E <br />23 <br />EA <br />$1,874.00 <br />$43,102.00 <br />8 <br />LIGHT STANDARD, LED UPGRADE TYPE F <br />15 <br />EA <br />$2,250.00 <br />$33,750.00 <br />9 <br />LIGHT POLE FOUNDATION <br />1 <br />EA <br />$3,143.00 <br />$3,143.00 <br />10 <br />NO.2 WIRE <br />8994 <br />LFT <br />$4.60 <br />$41,372.40 <br />11 <br />NO.4 WIRE <br />4340 <br />LFT <br />$3.10 <br />$13,454.00 <br />12 <br />NO.6 WIRE <br />4304 <br />LFT <br />$1.90 <br />$8,177.60 <br />13 <br />NO.8 WIRE <br />2111 <br />LFT <br />$1.40 <br />$2,955.40 <br />14 <br />NE)-= WIRE <br />49@ <br />LFT <br />- <br />15 <br />66 <br />LFT <br />- <br />16 <br />CONDUIT, PVC, SCHD 80, 2IN <br />3645 <br />LFT <br />$15.35 <br />$55,950.75 <br />17 <br />PULL BOX <br />2 <br />EA <br />$1,990.00 <br />$3,980.00 <br />18 <br />___E)_.._..__...._..._____....__..._.. ,_._. <br />2 <br />EA <br />19 <br />MAINTAINING TRAFFIC <br />1 <br />LS <br />$14,184.85 <br />$14,184.85 <br />BASE BID TOTAL $284,910.00 <br />Version 1/3/2025 Contractor's Bid for Public Works - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.