My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - The Monreaux Proj 125-066 - Big C Lumber Co
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - The Monreaux Proj 125-066 - Big C Lumber Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2025 1:32:03 PM
Creation date
11/25/2025 1:31:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/25/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. The City reserves the right to inspect and have any goods tested after delivery for compliance with <br />the Specifications. Notice of latent defects, which would make the item unfit for the purposes for <br />which they are required, may be given at any time within one year after discovery of defects. <br />6. The quote shall include the cost of delivery in the unit price for each item. <br />XI. RETAINAGE AND FINAL PAYMENT <br />A. Prevailing Specifications: 2026, INDOT Standard Specifications Section 109 <br />B. Additions: <br />1. Payments will be made every thirty (30) calendar days. <br />2. There will be NO Retainage. <br />3. Contractor shall invoice using the same nomenclature as specified in the bid proposal for all items. <br />XII. WARRANTY <br />A. Prevailing Specifications: None <br />B. Additions <br />1. All Parts shall include the following: <br />a. Performance specifications <br />b. Bill of Materials <br />C. Warranties on all parts <br />d. Installation and safety requirements <br />XIV. LUMBER <br />A. Prevailing specifications: None <br />B. Additions: <br />1. All items shall conform to attached specifications from R. Yoder. <br />2. For each item, a specification sheet shall be submitted for the proposed product. R. <br />Yoder will review and determine that products submitted meet the requirements of the project. <br />3. Delivery cost shall be included in the unit cost for each line item. <br />4. Any owner -requested modifications to the quantity or type of item shall be subject to a change <br />order. <br />5. Pricing shall apply for 12 months following award of quote. <br />Xv. ATTACHMENTS <br />A. Prevailing specifications: None <br />1. Attachments to this quote are- <br />a. 061000 — Rough Carpentry <br />b. 061600 — Sheathing <br />c. 061613—ZIP System R Sheathing <br />d. 061753 — Shop -Fabricated Wood Trusses <br />e. The Monreaux Building Structural Plans <br />XVI. M/WBE GOALS <br />Version 1/3/2025 Page - 4 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.