My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Redevelopment Commission Agenda & Packet 11.24.25
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2025
>
11.24.2025
>
Redevelopment Commission Agenda & Packet 11.24.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2025 11:49:14 AM
Creation date
11/20/2025 11:49:03 AM
Metadata
Fields
Template:
Dept of Community Investment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND REDEVELOPMENT COMMISSION REGULAR MEETING – November 13, 2025 <br /> <br />Page | 5 <br /> <br />The existing sidewalk is failing and does not provide an ADA-compliant <br />route due to cracking and missing ramps. Erosion on the adjacent slope <br />has worsened over time, causing structural issues that also need to be <br />addressed. <br /> <br />The proposed project includes: <br />• Replacing the sidewalk from the bridge to Hildreth Street <br />• Stabilizing the slope to prevent further erosion (extent to be <br />determined by engineering design) <br /> <br />Estimated costs: <br />• Design: $36,000 <br />• Construction: Approximately $200,000 <br /> <br />Total request: $250,000 to cover design, sidewalk replacement, and <br />slope stabilization. This will ensure accessibility and long-term stability <br />for the area. <br /> <br />Commissioner Gooden-Rodgers asked if this request would complete <br />the project and Ms. Stanton stated yes. <br /> <br />Upon a motion by Gillian Shaw for approval, seconded by David Relos, <br />the motion carried unanimously; the Commission approved the Budget <br />Request as presented on November 13, 2025. <br /> <br />2. Recommendation on RFP Proposal (Former YMCA Northside) <br />Joseph Molnar, Assistant Director of Growth and Opportunity, stated <br />that on April 2025, the RDC acquired seven parcels at 1201 Northside <br />Blvd. and Louise St. as part of an agreement with the YMCA that <br />facilitated its move downtown to the Leighton building. Since then, all <br />structures have been cleared, and the site is ready for redevelopment. <br />The property is located southeast of the South Bend Farmers Market <br />along the St. Joseph River. <br /> <br />RFP Process: <br />The Redevelopment Commission approved a Request for Proposals in <br />June, with submissions due September 11. One proposal was received <br />from Century Custom Builders, a local developer with extensive <br />experience. Their plan includes approximately 118 units—a mix of <br />apartments, duplexes, townhomes, and single-family homes—with <br />potential for commercial space. <br /> <br />Recommendation: <br />Staff reviewed the proposal, met with the developer, and confirmed it <br />meets all RFP criteria. We recommend continuing negotiations with
The URL can be used to link to this page
Your browser does not support the video tag.