REGULAR MEETING <br />SEPTEMBER 23, 2025 197 <br />BID: <br />Base Bid Total $505,100 <br />GREEN DEMOLITION CONTRACTORS, INC. <br />315 Brighton Street <br />LaPorte, IN 46350 <br />mikeggreendemolitioninc.com; kimggreendemolitioninc.com <br />Bid was signed by Michael Brough <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />Three (3) MWBE Forms (1.0, 2.0, 2.1) were submitted. <br />BID: <br />Base Bid Total $684,800 <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the <br />above bids were referred to Public Works and DO for review and recommendation. <br />AWARD QUOTATION AND APPROVE CONTRACT - THE POINTE AT RIVERWALK - <br />UTILITY MATERIALS - PROJECT NO. 124-069M (PR-00043008) <br />Gemma Staton, Engineering, advised the Board that on September 9, 2025, quotations <br />were received and opened for the above referenced project. After reviewing those <br />quotations, Ms. Staton recommended that the Board award the contract to the lowest <br />responsive and responsible quoter, Etna Supply Company, in the amount of $63,838.79. <br />Therefore, VP Molnar made a motion that the recommendation be accepted, and the <br />quotation be awarded, and the contract approved as outlined above. Mr. Miller seconded <br />the motion, which carried by roll call. <br />Board Attorney Schmidt noted for the record that post bid, a bidder asked if all bids were <br />"Buy America" compliant. He stated that City staff and engineering confirmed that Etna <br />Supply Company was compliant and confirmed it in writing. <br />APPROVE CHANGE ORDER NO. 1 - VPA LEEPER PARK TENNIS COURTS - PROJECT <br />NO. 1(Parks & Recreation) <br />President Maradik advised that Lidya Abreaha, Engineering, has submitted change order <br />number one on behalf of Byrne & Jones Construction, indicating the contract amount be <br />increased by $14,950 fora new contract sum, including this change order, in the amount of <br />$1,771,121.07. Upon a motion made byVP Molnar, seconded by Mr. Miller and carried by <br />roll call, the change order was approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT - BERCLIFF ESTATES SEWER <br />SEPARATION - PROJECT NO. 122-016C (PO-0028224) <br />President Maradik advised that Kyle Ludlow, Engineering, has submitted the project <br />completion affidavit on behalf of Milestone Contractors, L.P., for the above referenced <br />project, indicating a final cost of $752,055.36. Upon a motion made by VP Molnar, <br />seconded by Mr. Miller and carried by roll call, the project completion affidavit was <br />approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT - 2023 CONCRETE REPAIRS - <br />PROJECT NO.123-022 (PO-0025871) <br />President Maradik advised that Kyle Ludlow, Engineering, has submitted the project <br />completion affidavit on behalf of Milestone Contractors, L.P., for the above referenced <br />project, indicating a final cost of $3,292,628.21. Upon a motion made by VP Molnar, <br />seconded by Mr. Miller and carried by roll call, the project completion affidavit was <br />approved. <br />