Laserfiche WebLink
Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated July 22, 2025. <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. 02 <br />1.Background Data: <br />a.Effective Date of Owner-Engineer Agreement:10/06/2025 <br />b.Owner:City of South Bend Board of Public Works <br />c.Engineer: Abonmarche Consultants, Inc. <br />d.Project:O’Brien Park Splashpad and Restroom Installation <br />Description of Modifications: <br />[NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to <br />this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity <br />with respect to the modifications to be made. Use paragraph numbers in this document for ease of <br />reference herein and in future correspondence or amendments.] <br />a.Engineer shall perform or furnish the following Additional Services: <br />1)Construction Documents <br />a)Development of construction documents for the O’Brien Park site <br />improvements. Probable construction cost estimate will be performed at the <br />60% DD and 90% CD level of document production. These improvements <br />include the playground, splashpad, pavilion, and restroom design, as well as <br />coordination with the applicable vendors for the playground and the splash pad. <br />The plans are anticipated to include a project cover sheet, existing conditions, <br />site development plans to include parking and hardscape areas, stormwater <br />management (SWPPP), drainage design and drainage calculations, utility plan, <br />grading plan, landscape plan with construction details. Construction notes will <br />be shown on applicable sheets to further detail the design. This task includes <br />the preparation of front-end specifications and bid documents. Abonmarche <br />will design the site improvements to meet the zoning requirements in <br />accordance with the minimum requirements of the governing regulatory agency <br />and the Client’s directive. <br />2)Soil Erosion and Sedimentation Control (SESC) Permitting <br />a)This task includes our submission of the SWPPP to the St. Joseph County Soil <br />and Water Conservation District for review. Once we receive the County’s <br />review form, we will submit a Notice of Intent (NOI) to IDEM for review. This <br />process will require the posting of a public notice prior to the submission of the <br />SWPPP for local review. Unless it is discussed otherwise, Abonmarche will